FIELD: mining. SUBSTANCE: drilled from surface over contour of caved zone are holes through overhanging rock mass above cave and charged with explosives and blasted to loose and cave overhanging rocks within boundaries of displacement. Then, formed collapse funnel is filled with loose material and compacted. Holes are drilled from surface within cave-in boundaries and cased, with casing string perforated in its lower part, and rocks are consolidated by injection through casing cementing mixture from working floor up to level of artificial roof. Then, working is driven through consolidated rocks. EFFECT: higher safety of operation and reliable support of reconditioned mine workings.
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR SUPPORTING MINING WORKINGS WITH LOOSE ROOF ROCK BY ANCHOR SUPPORT | 1997 |
|
RU2128773C1 |
METHOD OF SUPPORTING AND FILLING-UP VOIDS BEYOND THE SUPPORT OF A MINE WORKING BEING RESTORED | 0 |
|
SU1239347A1 |
MINE WORKING RESTORING METHOD | 0 |
|
SU1033757A1 |
METHOD OF UNDERGROUND SOLID MINERAL DEPOSIT MINING | 2004 |
|
RU2277171C1 |
METHOD FOR PROTECTION OF REUSED WORKINGS | 1991 |
|
RU2013546C1 |
METHOD OF DRIVING A PASSAGE THROUGH FALLEN ROCK AT RESCUE OPERATIONS | 0 |
|
SU737632A1 |
METHOD OF SUPPORTING MINE WORKINGS IN ADJACENT COAL SEAMS | 1999 |
|
RU2167301C1 |
INJECTOR-ANCHOR FOR FIXING CRACKED ROOF OF MINE WORKINGS | 2023 |
|
RU2802410C1 |
METHOD FOR BACKFILLING WORKED OUT SPACE IN UNDERGROUND GASIFICATION OF SOLID FUEL | 1992 |
|
RU2072037C1 |
METHOD OF CONTROLLING ROCK PRESSURE | 0 |
|
SU1606667A1 |
Authors
Dates
1994-01-15—Published
1990-11-11—Filed