FIELD: construction.
SUBSTANCE: subway station having construction system for underground transport stopping point with civil defence protective devices includes structures, devices and premises for servicing of passengers and station personnel. Subway station is made as united construction complex consisting of construction system for underground transport stopping point with civil defence protective devices and auxiliary system of structures located in vertical excavation over the stopping point. Construction complex includes common structures of outside bearing walls along perimetre of the construction complex, common structures of intermediate supporting structures placed between structures of outside bearing walls, foundation placed at basement soil with support by the lower part of outside bearing walls structures, structures of intermediate supporting structures and coating components. The complex includes separating elements, modal constrains and reinforcing elements for structures. Support structures of inner walls, common structures of intermediate supporting structures and/or common structures of outside bearing walls in their lower part under foundation slab are restrained by basement soil.
EFFECT: providing reliable protection of the deep-laid station from impacts, constructing of the subway station in vertical soil excavation with simultaneous increasing of useful capacity.
21 cl, 20 dwg
Title | Year | Author | Number |
---|---|---|---|
SINGLE-VAULTED SUBWAY STATION ARRANGED IN DOUBLE-TRACK MAIN LINE TUNNEL | 2019 |
|
RU2701762C1 |
SUBWAY STATION ERECTION METHOD (YURKEVICH(S METHOD) | 2014 |
|
RU2565314C2 |
SINGLE-VAULT MULTILEVEL SUBWAY STATION AND METHOD OF ITS CONSTRUCTION (P.B. YURKEVICH'S DESIGN) | 2014 |
|
RU2562359C2 |
THREE-ARCHED UNDERGROUND STATION OF COLUMN TYPE AND ITS ERECTION METHODS (YURKEVICH DEVICE AND METHODS) | 2012 |
|
RU2510444C2 |
METHOD OF ERECTION AND ARRANGEMENT OF A SINGLE-SPAN UNDERGROUND METRO STATION OF AN OPEN METHOD OF PERFORMING WORKS | 2019 |
|
RU2715497C1 |
SUBWAY LINE IN DEEP URBAN AREAS | 2023 |
|
RU2808273C1 |
THREE-SPAN METRO STATION CONSTRUCTED IN ACCORDANCE WITH THE OPEN BUILDING METHOD WITH AN ISLAND PASSENGER PLATFORM AND SINGLE-TRACK RUNNING TUNNELS | 2019 |
|
RU2746610C1 |
SHALLOW LYING SINGLE-VAULT METRO STATION, CONSTRUCTED BY A CLOSED METHOD FOR WORK, WITH A LINING MADE OF MONOLITHIC REINFORCED CONCRETE | 2021 |
|
RU2771803C1 |
METHOD FOR ERECTING A THREE-SPAN METRO STATION WITH A DOUBLE-TRACK MIDDLE STATION TUNNEL AND SIDE STATION HALLS WITH PASSENGER PLATFORMS | 2022 |
|
RU2779168C1 |
METHOD FOR ERECTION OF GRADE-CROSSING ELIMINATION STRUCTURE | 1999 |
|
RU2152472C1 |
Authors
Dates
2014-01-27—Published
2012-03-30—Filed