FIELD: plants for biological treatment of sewage waters. SUBSTANCE: plant has aerobic stabilizer 1 with pipeline 2 for sludge supply, spillway 3 and partition 4, methane tank 6 found inside stabilizer. Spillway 3 and partition 4 form mineralization chamber 7, biocoagulation chamber 8 with degassing system, and chamber 9 for thickening of stabilized sludge. Methane tank 6 is separated by partitions 11 and 12 into chamber of acid fermentation and chamber of alkali fermentation. Secured to partitions 12 by pairs with some clearance are additional walls forming bypass channels. Acid fermentation chamber has pipeline 19 for raw sludge supply. It is sound practice to place autoclave 20 with inlet pipe 21 for supply of steam and stabilized thickened mixture into its internal part and outlet pipe for discharge from autoclave of nutritious substrate to stabilizer 1, acid fermentation chamber and bypass valves. EFFECT: reduced capital and working costs and higher productivity. 5 cl, 5 dwg
Title | Year | Author | Number |
---|---|---|---|
ANAEROBIC WASTE WATER SEDIMENT STABILIZATION PLANT | 1997 |
|
RU2111179C1 |
DEVICE FOR STABILIZATION OF WASTE WATER SEDIMENTS | 0 |
|
SU1576498A1 |
RADIAL SETTLER FOR SEPARATING SLUDGE MIXTURE | 1997 |
|
RU2114788C1 |
WASTE WATER BIOLOGICAL TREATMENT PLANT | 1997 |
|
RU2114793C1 |
ACCUMULATOR TANK | 1998 |
|
RU2138317C1 |
FLOTATOR | 1997 |
|
RU2129095C1 |
VERTICAL SETTLING DEVICE | 1998 |
|
RU2153384C1 |
APPARATUS TO PROCESS GUANO | 1991 |
|
RU2017810C1 |
HEAT RECOVERY AND WASTE GAS CLEANING SYSTEM | 2000 |
|
RU2175101C1 |
GRAINY FILTER | 1996 |
|
RU2116117C1 |
Authors
Dates
1999-07-20—Published
1997-11-12—Filed