FIELD: railway transport; permanent way servicing. SUBSTANCE: according to proposed method, length-to-tie connections are loosened and rail length is lifted on supports featuring low friction coefficient, then tension is applied to length and the latter is heated. Complex includes track machine with tension device, continuous rail length lifting device, heating device is form of steam heating plant with system of steam passing channels, and nut runner. EFFECT: increased efficiency of stress relief. 5 cl, 10 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR DISCHARGING THERMAL STRESS IN ADJACENT STRANDS OF CONTINUOUS-JOINT TRACK | 2021 |
|
RU2807782C2 |
METHOD TO EXTEND CONTINUOUS WELDED RAIL TRACK LENGTHS | 2011 |
|
RU2495975C2 |
METHOD OF RELIEVING STRESS IN RAIL FRAME OF JOINTLESS TRACK | 2009 |
|
RU2399714C1 |
METHOD TO EXTEND CONTINUOUS WELDED RAIL TRACK LENGTHS | 2010 |
|
RU2453648C1 |
METHOD FOR LENGTHENING OF LONG STRINGS OF CONTINUOUS WELDED RAIL TRACK | 2012 |
|
RU2520178C2 |
METHOD OF REPLACING REUSABLE RAILS BY CONTINUOUS WELDED TRACK RAILS WITH SIMULTANEOUS ASSIGNMENT IN DESIGN INTERVAL OF FASTENING TEMPERATURES | 2010 |
|
RU2450096C1 |
DEVICE TO EXTEND THREADS OF LONG-WELDED RAILS DURING RELAXATION OF TEMPERATURE STRESSES | 2010 |
|
RU2456398C1 |
TRACK MACHINE MOUNTING PLATFORM LIFTING MECHANISM | 1996 |
|
RU2120912C1 |
CONTACT SYSTEM MAINTENANCE AND REPAIR LIFTING DEVICE | 1997 |
|
RU2114048C1 |
METHOD TO INSTALL CONTINUOUS WELDED RAIL | 2010 |
|
RU2437978C2 |
Authors
Dates
1999-08-27—Published
1997-07-16—Filed