FIELD: mining industry. SUBSTANCE: this method can be used at stoping operations in coal deposit. According to method, at planning of stoping in tectonic stressed sedimentary deposit including coal deposit, performed is selection of stoping direction, length of stoping face, speed and succession of seam working. For this purpose, orientation of stoping operations is performed depending on direction, length in direction and width of seam wash-out in deposit mass detected and projected with taking account of tectonic process which is determined by energy of fold formation and tectonic energy. This allows in future of increasing output of recovered mineral. EFFECT: higher efficiency. 11 cl
Title | Year | Author | Number |
---|---|---|---|
METHOD OF PLANNING STOPES WITH CONSIDERATION OF PREVENTION AND ELIMINATION OF ROCK BURSTS, IN PARTICULAR, IN COAL DEPOSIT | 1997 |
|
RU2131516C1 |
METHOD OF DETERMINATION OF BOREHOLE LOCATIONS | 1995 |
|
RU2143555C1 |
METHOD OF OPTIMIZED ORIENTATION OF BREAKAGE FACES, SPECIFICALLY ON COAL DEPOSIT | 1994 |
|
RU2109948C1 |
METHOD FOR TECTONIC ZONING OF POTASSIUM DEPOSITS | 2003 |
|
RU2255223C1 |
METHOD OF SEARCH FOR LATENT MINERALIZATION | 1992 |
|
RU2056644C1 |
METHOD TO PREPARE BLOCKS IN LARGE DEPTHS | 1991 |
|
RU2029868C1 |
METHOD FOR CONTROLLING SHIFTS MODE IN FRAGMENTS OF SEISMIC-ACTIVE TECTONIC FRACTURES | 2004 |
|
RU2273035C2 |
METHOD FOR REDUCTION OF EXCESSIVE ELASTIC ENERGY IN DEEP SEISMIC DANGEROUS SEGMENTS OF FRACTURES | 2020 |
|
RU2740630C1 |
UNDERGROUND MOBILE POWER PLANT | 1995 |
|
RU2123118C1 |
DIAMOND-POTASSIUM DEPOSIT MINING METHOD | 2004 |
|
RU2286456C2 |
Authors
Dates
1999-09-20—Published
1996-11-07—Filed