FIELD: mining industry.
SUBSTANCE: method includes marking raised and depressed portions in ceiling of salt deposit by drilling reconnaissance wells. Then regional tectonic structures are marked and tectonic zones positioned between them, and also between regional tectonic structure and limit, separating platform from salt-bearing depression. Sub-layer model of deposit is built, separating sub-salt, salt and super-salt rock complexes. Value of displacement of tectonic zones during transfer from super-salt complex t salt complex is determined, and also level of positioning for each bed, after that horizontal shifts are detected, which complicate tectonic zoning. Possible geological complications are predicted during mining operations.
EFFECT: higher personnel safety, higher efficiency.
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR HYDROGEOLOGICAL ZONING OF MINE FIELDS OF POTASSIUM PRODUCING ENTERPRISES | 2003 |
|
RU2261330C2 |
METHOD FOR SALT DEPOSIT DEVELOPMENT ALONG WITH PLATINUM OBTAINING FROM STRATUM ABOVE SALT LAYER | 2003 |
|
RU2265124C2 |
METHOD FOR DEVELOPMENT OF SALT DEPOSIT WITH PRODUCTION OF PLATINUM GROUP METALS FROM OLD COASTAL-MARINE ZONE | 2024 |
|
RU2826418C1 |
PROCESS OF WINNING GOLD AT POTASSIUM FIELD | 1999 |
|
RU2170352C1 |
METHOD OF UNDERGROUND BURIAL OF POTASSIUM PLANT EXCESSIVE BRINES | 2000 |
|
RU2188955C2 |
DIAMOND-POTASSIUM DEPOSIT MINING METHOD | 2004 |
|
RU2286456C2 |
METHOD OF PREVENTING FLOODING OF POTASH MINE OVER REEF ARRAY | 2016 |
|
RU2642610C1 |
METHOD OF PREDICTING EARTHQUAKE TIME IN POTASH SALT MINES | 1998 |
|
RU2153584C2 |
MONITORING METHOD FOR ANOMALOUS ZONES OF WATERPROOF LAYER IN POTASSIUM MINE | 2004 |
|
RU2257472C1 |
METHOD OF MINING OF POTASSIUM ORE DEPOSITS UNDER SLOPES OF RIVER VALLEYS (VERSIONS) | 2000 |
|
RU2186978C2 |
Authors
Dates
2005-06-27—Published
2003-11-04—Filed