FIELD: construction of foundations. SUBSTANCE: process of deep compaction of soil includes sequential screwing of working element in the form of casing with spiral coiling and closed lower end into soil. Feed and compaction of soil forming pile is carried out by screwing casing out under vertical load corresponding to pressure on soil equal to 0.3-0.6 MPa. EFFECT: expanded application field of process of deep compaction of soil, improved control over compaction of soil forming pile. 2 dwg
Title | Year | Author | Number |
---|---|---|---|
BORED PILE AND METHOD FOR PILE ERECTION IN KARST OR SOFT GROUND | 2004 |
|
RU2270294C1 |
PROCESS OF ERECTION OF GUARDING ANTIFILTRATION ENGINEERINGPRTECTIVE STRUCTURE | 2001 |
|
RU2206663C1 |
TECHNIQUE TO ERECT ANTIFILTRATION ENGINEERING-PROTECTIVE STRUCTURE | 2001 |
|
RU2211283C1 |
PROCESS OF ERECTION OF PILE IN GROUND | 2001 |
|
RU2208088C2 |
PROCESS OF ERECTION OF PILE IN GROUND | 2001 |
|
RU2208089C2 |
METHOD FOR CONSOLIDATING DEEP-MOUNTED SUPPORTING STRUCTURE | 1999 |
|
RU2179214C2 |
METHOD FOR CONCRETE PILE SHOE FORMING | 2004 |
|
RU2276227C1 |
PILE | 2001 |
|
RU2204653C2 |
METHOD FOR CONSTRUCTING BORED PILE IN SOIL | 2023 |
|
RU2804651C1 |
METHOD FOR BORED PILE ERECTION IN GROUND | 2007 |
|
RU2317373C1 |
Authors
Dates
1999-11-10—Published
1997-07-28—Filed