FIELD: oil production industry. SUBSTANCE: according to method, initially selected are operational objects, then producing and injection wells are drilled in selected operational objects. After that, displacing agent is injected into injection wells, and oil is recovered from producing wells. Determined at beginning is total increase of initial amplitude rate of production of design wells. Selection of operational objects is performed in correspondence with criteria of rational combination expressed in number of formulas brought forth in description of invention. EFFECT: higher efficiency. 2 tbl
Title | Year | Author | Number |
---|---|---|---|
METHOD OF DEVELOPMENT OF MULTILAYER OIL FIELD | 2001 |
|
RU2188938C1 |
METHOD CONTROLLING DEVELOPMENT OF OIL POOL | 1999 |
|
RU2144133C1 |
METHOD OF DEVELOPMENT OF MULTIBED OIL DEPOSITS | 2005 |
|
RU2338059C2 |
METHOD FOR ANALYSIS OF MULTI-BED WELLS | 2003 |
|
RU2247237C1 |
METHOD OF DEVELOPMENT OF SHALLOW LOW-YIELD OIL DEPOSITS | 2007 |
|
RU2342521C1 |
METHOD FOR DEVELOPMENT OF MULTI-HORIZON NON-UNIFORM OIL FIELDS BY MEANS OF BRANCHED HORIZONTAL WELLS | 2007 |
|
RU2339801C2 |
METHOD FOR EXTRACTING OF OIL DEPOSIT | 2003 |
|
RU2238399C1 |
MULTIFORMATION OIL DEPOSIT DEVELOPMENT METHOD | 2012 |
|
RU2474676C1 |
PROCESS OF WORKING OF MULTIPOOL OIL FIELD | 1999 |
|
RU2160362C2 |
METHOD FOR MULTIPAY OIL FIELD DEVELOPMENT | 2005 |
|
RU2307923C2 |
Authors
Dates
1999-11-27—Published
1998-04-22—Filed