FIELD: oil and gas extractive industry.
SUBSTANCE: method includes lowering equipment into well and performing analysis during extraction of oil from oil beds. In accordance to invention after raising down-pumping equipment from the well liquid is replaced with degassed liquid, and research is performed during pumping in of degassed liquid into oil beds and extraction of degassed oil from oil beds, at the same time pumping is performed using exhaust gases under high pressure from moving compressor, and extraction of degassed oil - by letting exhaust gases out of the well. During that on basis of share of oil beds in total debit of product and extraction and on basis of face pressures during extraction and removal bed pressures of oil beds are determined together with their productiveness coefficient.
EFFECT: higher reliability and precision.
1 ex
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR DETERMINING FLOW PROFILE IN LOW-RATE HORIZONTAL WELLS WITH MULTI-STAGE HYDRAULIC FRACTURING | 2018 |
|
RU2680566C1 |
METHOD FOR DEVELOPMENT OF OIL RESERVOIR OF MULTI-LAYER OIL AND GAS CONDENSATE DEPOSIT | 2019 |
|
RU2737043C1 |
DEVELOPMENT METHOD OF TIGHT OIL RESERVOIRS BY CYCLIC PUMPING OF CARBON DIOXIDE | 2016 |
|
RU2630318C1 |
METHOD FOR DEVELOPMENT OF MULTIPLE-BED DEPOSITS | 1998 |
|
RU2142046C1 |
METHOD OF BOREHOLE AND WELLHEAD EQUIPMENT LAYOUT FOR WELL SURVEY ENVISAGING INJECTION OF INJECTION FLUID TO FORMATION AND EXTRACTION OF FLUIDS FROM FORMATION | 2013 |
|
RU2531414C1 |
PROCEDURE FOR ELIMINATION OF CROSS-FEEDS | 2010 |
|
RU2413840C1 |
METHOD FOR CONCURRENT-SEPARATE OPERATION OF SEVERAL BEDS VIA ONE FORCE WELL IN TURNS | 2003 |
|
RU2253009C1 |
METHOD FOR EXTRACTING OF OIL DEPOSIT | 2003 |
|
RU2238399C1 |
MULTILAYER OIL DEPOSIT DEVELOPMENT METHOD | 2014 |
|
RU2558546C1 |
METHOD OF DEVELOPMENT OF MULTIPAY OBJECT WITH HIGH-VISCOSITY OIL | 2015 |
|
RU2584703C1 |
Authors
Dates
2005-02-27—Published
2003-08-07—Filed