FIELD: mining industry. SUBSTANCE: method relates to surrounding arrangement of mineral deposits. Collecting pits are used for storing waste resulted from drilling of oil and gas wells and they can be used in construction of hydraulic engineering structures. Realization of method implies ground levelling operations, construction of pit base and waterproofing of pit bottom. Aforesaid operations are performed simultaneously with spreading and compaction of sand-clay mixture with subsequent building of embankment. Application of aforesaid method allows for reduction of cost and period in construction of collecting pit. EFFECT: higher efficiency.
Title | Year | Author | Number |
---|---|---|---|
STORAGE PIT BUILDING METHOD | 2004 |
|
RU2272869C2 |
METHOD OF SLUDGE PITS RECLAMATION WITHOUT THEIR BACKFILLING ON FOREST FUND TERRITORY OF RUSSIAN FEDERATION IN MIDDLE TAIGA SUBZONE OF WESTERN SIBERIA | 2015 |
|
RU2617632C2 |
METHOD FOR DISMOUNTING EARTH STORAGES | 1999 |
|
RU2170304C2 |
SOIL-SLIME MIX | 2013 |
|
RU2522317C1 |
MAN-MADE PEATY SOIL FOR RECLAMATION OF OIL-CONTAMINATED AND DISTURBED LANDS | 2013 |
|
RU2520145C1 |
METHOD OF CONSTRUCTION OF ACCUMULATION SUMP | 2019 |
|
RU2707606C1 |
METHOD OF A STORAGE BARN RECULTIVATION | 2003 |
|
RU2251564C2 |
SUBTERRANEAN-SLURRY MIXTURE FOR RECLAMATION LAND AND METHOD OF SOIL RECULTIVATION USING MENTIONED ABOVE MIXTURE | 2015 |
|
RU2631391C2 |
PROCEDURE FOR SUMP BUILDING AT CONSTRUCTION OF OIL-GAS CONDENSATE DEPOSITS | 2010 |
|
RU2431733C1 |
METHOD OF DRILLING MUD UTILISATION | 2010 |
|
RU2439098C2 |
Authors
Dates
2000-01-10—Published
1997-02-24—Filed