FIELD: mining engineering; cluster construction engineering of oil and gas wells. SUBSTANCE: method involves arrangement of sectional storage and its diking, waterproofing of bottom and diking walls, accumulation of well drilling wastes, squeezing liquid phase from one section to next one, filling solid phase of drilling wastes with mineral ground. Novelty is that storage is located in body of cluster drilling place along movement of drilling rig; filling solid phase of drilling wastes with mineral ground is effected after filling each storage section in the course of well drilling. EFFECT: reduced time for cluster well construction; provision for creating artificial landscapes. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF SLUDGE PITS RECLAMATION WITHOUT THEIR BACKFILLING ON FOREST FUND TERRITORY OF RUSSIAN FEDERATION IN MIDDLE TAIGA SUBZONE OF WESTERN SIBERIA | 2015 |
|
RU2617632C2 |
METHOD OF RESTORING EARTH RESERVOIRS | 1994 |
|
RU2109031C1 |
METHOD FOR LIQUIDATION OF GROUND STORAGE-COLLECTOR OF DRILLING WASTE | 1997 |
|
RU2123574C1 |
METHOD FOR RECULTIVATION OF EARTH WAREHOUSE | 2002 |
|
RU2245352C2 |
METHOD OF RECLAMATION OF DRILLING SLUDGE CULVERT | 2018 |
|
RU2702184C1 |
DRILLING REJECT BURIAL METHOD | 2001 |
|
RU2201949C2 |
EARTH SUMP RECLAMATION METHOD | 2004 |
|
RU2273736C1 |
METHOD FOR CONSTRUCTION OF COLLECTING PIT | 1997 |
|
RU2144112C1 |
RECLAMATION METHOD OF DRILLING SLUDGE PIT | 2013 |
|
RU2539470C1 |
METHOD OF ELIMINATING DRILLINGS ACCUMULATION PIT | 1999 |
|
RU2162918C1 |
Authors
Dates
2001-07-10—Published
1999-08-09—Filed