FIELD: gas and oil production.
SUBSTANCE: method of drilling mud utilisation includes the following stages: drilling mud is cleaned and pressed out in four-stage treatment system; then drilling mud is sent to a trench made in the bed of well site bed; temporary ground tank for drilling sewage is made behind the trench. Four-stage treatment system includes high-performance mud screens, shale shaker-desander, desilter and centrifuge.
EFFECT: reduced harmful effect on environment during well construction.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR THE DISPOSAL OF DRILLING MUDS WITH THE PRODUCTION OF ENVIRONMENTALLY FRIENDLY SOIL | 2017 |
|
RU2661831C1 |
METHOD FOR PROCESSING DRILL CUTTINGS TO OBTAIN RECLAMATION SOIL FOR TECHNICAL AND BIOLOGICAL RECLAMATION | 2022 |
|
RU2802741C1 |
METHOD OF RECYCLING SPENT DRILLING MUD | 2014 |
|
RU2583963C2 |
WELL CONSTRUCTION METHOD | 2006 |
|
RU2320847C1 |
METHOD OF SLUDGE PITS RECLAMATION WITHOUT THEIR BACKFILLING ON FOREST FUND TERRITORY OF RUSSIAN FEDERATION IN MIDDLE TAIGA SUBZONE OF WESTERN SIBERIA | 2015 |
|
RU2617632C2 |
IMPROVED ROAD-BUILDING SOIL | 2013 |
|
RU2541009C2 |
ROAD-BUILDING COMPOSITE MATERIAL | 2013 |
|
RU2551560C2 |
METHOD FOR CONSTRUCTING SLUDGE STORAGE PIT FOR WELL CUTTINGS AT OIL AND GAS DEPOSITS (VERSIONS) | 2014 |
|
RU2558834C1 |
PROCESSING METHOD OF DRILLING WASTES ON TERRITORY OF CLUSTER SITE | 2013 |
|
RU2551564C2 |
METHOD OF BORE MUD PROCESSING | 2013 |
|
RU2524708C1 |
Authors
Dates
2012-01-10—Published
2010-02-24—Filed