FIELD: oil and gas industry.
SUBSTANCE: method includes allocation of production facilities, development of the grid of producers and injectors, drilling of wells or selection from available well stock, production of hydrocarbons and injection of a displacement agent to the injection wells. According to the invention producers are used for combined operation of at least two producer facilities by one production tubing using a jet device for lifting of fluids from the two facilities through a flow string and for creating depression to the low-pressure facility due to energy of full flow rate of fluid from the high-pressure facility, and this fluid serves as a working agent for a jet pump at least up to the position level of the first gas lift valve. Injectors are used for volume-adjustable borehole fluid bypass from the high-pressure formation to the low-pressure one. At that at borehole fluid bypass from the high-pressure formation to the low-pressure one through injectors and producers depression is adjusted additionally in the low-pressure formation between the injectors and producers thus ensuring the rate, which washes retrograde condensate off from the enclosing rock pores in the low-pressure formation.
EFFECT: improvement of final condensate recovery from the high-yield formation due to increase of filtration rate of the displacing agent, involvement of trapped gas areas into development process.
1 ex, 1 tbl
Title | Year | Author | Number |
---|---|---|---|
PROCEDURE FOR SIMULTANEOUS OPERATION OF SEVERAL OBJECTS IN PRODUCER AND DEVICE FOR ITS IMPLEMENTATION | 2010 |
|
RU2438008C1 |
METHOD FOR SIMULTANEOUS PRODUCTION OF FLUIDS PRONE TO TEMPERATURE PHASE TRANSITION | 2020 |
|
RU2740884C1 |
METHOD OF ADDITIONAL DEVELOPMENT OF WATER-FLOODED SECTIONS OF GAS-CONDENSATE DEPOSIT OF OIL AND GAS CONDENSATE DEPOSIT | 2019 |
|
RU2744535C1 |
METHOD OF DRILLING WELLS AND DEVELOPMENT OF MULTIBED DEPOSITS OF HYDROCARBONS WITH NON-UNIFORM GEOLOGICAL CONDITIONS OF BED ATTITUDES | 2008 |
|
RU2370640C1 |
METHOD FOR DEVELOPMENT OF OIL RESERVOIR OF MULTI-LAYER OIL AND GAS CONDENSATE DEPOSIT | 2019 |
|
RU2737043C1 |
BOREHOLE PLANT FOR SIMULTANEOUS SEPARATE AND ALTERNATE OPERATION OF SEVERAL FORMATIONS BY SINGLE WELL | 2003 |
|
RU2262586C2 |
METHOD FOR WELL DRILLING AND DEVELOPMENT OF MULTIHORIZON HYDROCARBON FIELD CHARACTERIZED BY NON-UNIFORM GEOLOGICAL CONDITIONS OF PRODUCTIVE BED ATTITUDES | 2006 |
|
RU2295632C1 |
WET GAS OR GAS CONDENSATE WELL RECOVERY METHOD AND ITS DROWNING PREVENTION DURING ITS FURTHER OPERATION | 2013 |
|
RU2534291C1 |
METHOD FOR MAINTENANCE OF MULTILAYER OIL FIELDS | 1998 |
|
RU2151279C1 |
SEPARATE MAINTENANCE PROCESS FOR INJECTION OR PRODUCTION WELL AND IMPLEMENTATION VARIANTS | 2006 |
|
RU2328590C1 |
Authors
Dates
2014-07-20—Published
2013-03-01—Filed