FIELD: railway construction technology. SUBSTANCE: switching unit has two pairs of moving rails 1, 2 and 3, 4 which are installed on metal bridges 5, 6 at points of their joining with adjacent rails with possibility of their sliding along surface of metal bridges at switching of moving train from one track line to another track line. Also provided are bars 9, 10, 11, 12 installed on base of railway switch and rigidly connected with metal bridges. There are bars with metal liners on their upper surface for sliding of moving rails on section between bridges. Ends of bars with metal liners on aforesaid section are rigidly connected to each other by at least two beams 15, 16. Application of aforesaid embodiment of switching unit allows for reducing capital input for installing and maintenance of railway switch. EFFECT: higher efficiency. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
SWITCHING UNIT OF RAILWAY SWITCH | 1998 |
|
RU2148687C1 |
SWITCH | 1998 |
|
RU2150544C1 |
SWITCH | 2005 |
|
RU2284386C2 |
POINTLESS SWITCH | 2005 |
|
RU2270896C1 |
DEVICE FOR FASTENING FRAMING RAIL IN RAIL SWITCH | 1996 |
|
RU2095511C1 |
FLOW LINE FOR ASSEMBLY OF RAIL TRACK SWITCH | 2010 |
|
RU2451125C1 |
SWITCH POINT | 1996 |
|
RU2097467C1 |
STUB SWITCH | 2008 |
|
RU2369676C1 |
STAND FOR ASSEMBLY OF SWITCHES | 1991 |
|
RU2007507C1 |
METHOD TO ASSEMBLE SWITCH THROWS | 2009 |
|
RU2424392C1 |
Authors
Dates
2000-05-10—Published
1998-11-03—Filed