FIELD: construction.
SUBSTANCE: method to assemble switch throws, mostly with reinforced concrete bars, consists of process operations executed simultaneously on stationary benches equipped with an embracing track to move actuators. The method includes delivery of a set of bars with their reference layout, installation of bars by epure and string, laying of gaskets, pads on them, laying rails onto bars, installation of rails by track and ordinates, installation of assemblies of insert and terminal bolts, screwing nuts of these bolts. Process operations are divided into complexes, and they are carried out simultaneously at stationary benches. Benches are installed in the quantity of at least three pieces along the track. On completion of a complex of operations at one bench the actuators are moved along the track to the following bench. From the last bench the actuators are transferred to the beginning of the track to the first bench.
EFFECT: increased rate of assembled switch throws production with preservation of optimal length and width of a flow line.
3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD TO ASSEMBLE POINT SWITCHES | 2008 |
|
RU2382134C1 |
PRODUCTION ASSEMBLY LINE OF TRACK SWITCHES | 2008 |
|
RU2385373C1 |
METHOD FOR FLOW ASSEMBLY OF POINT SWITCHES | 2008 |
|
RU2374377C2 |
MOBILE UNIT FOR REINFORCED CONCRETE BEAMS INSTALLATION IN POINT OPERATING GEAR AGAINST DIAGRAM AND ORDINATES | 2007 |
|
RU2355843C1 |
FLOW LINE FOR ASSEMBLY OF RAIL TRACK SWITCH | 2010 |
|
RU2451125C1 |
LINE FOR REPAIR OF RAILWAY TRACK LENGTHS WITH REINFORCED CONCRETE TIES | 2007 |
|
RU2361032C1 |
FLOW LINE FOR ASSEMBLY OF POINT SWITCHES OF RAILWAY TRACK | 2008 |
|
RU2373319C1 |
RAILWAY SLIP SWITCH ASSEMBLY BELT LINE | 2009 |
|
RU2400590C1 |
FLOW LINE FOR ASSEMBLY OF RAIL TRACK SWITCH | 2010 |
|
RU2451124C1 |
MOBILE DEVICE TO INSTALL POINT WORK RAILS BASED ON TRACK AND ORDINATES | 2008 |
|
RU2376410C1 |
Authors
Dates
2011-07-20—Published
2009-11-05—Filed