FIELD: railway construction technology. SUBSTANCE: machine is intended for embedding rail fastenings in concrete at building railway track structure with concrete slab and without use of crushed-stone ballast. Machine has gantry frame 1 with travel mechanisms 5. Installed on longitudinal members 3 of gantry frame are rails 6 for hoisting crane 7. Located on gantry frame 1 is multiplicity of concrete-placing frames 8 with supports 11 for shuttering 12 for clamping devices 13. Concrete-placing frames 8 are provided with concrete delivery pipelines 14. In operation of machine, concrete-placing frames 8 can be repositioned so as to adjust operating procedure of concrete-placing frames 8 according to following scheme of repositioning "x, 1 to (x-1)", "(x-1), x, to (x-2)". Application of aforesaid embodiment of machine allows for embedding rail fastenings in concrete with high accuracy. EFFECT: higher efficiency. 3 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR CONSTRUCTION OF RAILWAY TRACK STRUCTURE WITHOUT CRUSHED-STONE BALLAST | 1995 |
|
RU2148685C1 |
METHOD OF AND MACHINE FOR MAKING AND SETTING RAIL SUPPORT POINTS IN CORRECT POSITION | 1995 |
|
RU2151230C1 |
MACHINE FOR CONTINUOUS REPLACEMENT OF RAILWAY TRACK | 0 |
|
SU1012801A3 |
0 |
|
SU212813A1 | |
METHOD FOR INSTALLATION OF PERMANENT WAY | 2007 |
|
RU2352705C1 |
RAIL TRACK AND METHOD TO MANUFACTURE RAIL TRACK | 2007 |
|
RU2449071C2 |
TRACK UPPER STRUCTURE DESIGN | 2007 |
|
RU2352706C1 |
MACHINE FOR AND METHOD OF REMOVING OLD AND LAYING NEW RAIL TRACK | 2001 |
|
RU2207423C2 |
SYSTEM OF RAIL FASTENING IN TRANSITION ZONES | 2013 |
|
RU2605813C2 |
APPARATUS FOR CONSTRUCTING ROOFS OF CONCRETE MIXES | 0 |
|
SU1201409A1 |
Authors
Dates
2000-05-10—Published
1995-11-30—Filed