FIELD: ice-made crossings over water basins. SUBSTANCE: method relates to creation of ice-made crossings over natural ice cover for movement of transportation vehicles. According to method, higher load-bearing capacity of ice crossing is achieved by placing thermal-insulating material under natural ice cover along route of ice crossing. EFFECT: higher efficiency. 1 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR CREATION OF ICE CROSSING | 1998 |
|
RU2137877C1 |
METHOD FOR ERECTING ICE TEMPORARY BRIDGE | 1999 |
|
RU2170790C2 |
METHOD FOR CREATING ICE-BOUND CROSSING | 1998 |
|
RU2132898C1 |
METHOD FOR CREATION OF ICE-BOUND CROSSING | 1998 |
|
RU2132900C1 |
METHOD FOR CREATION OF ICE-BOUND CROSSING | 1998 |
|
RU2132899C1 |
METHOD FOR CREATION OF ICE-BOUND CROSSING | 1998 |
|
RU2132901C1 |
ICE CROSSING CONSTRUCTION PROCESS | 2000 |
|
RU2164975C1 |
METHOD OF BUILDING ICE CROSSING | 1998 |
|
RU2135685C1 |
METHOD FOR ERECTING TEMPORARY ICE BRIDGE | 2000 |
|
RU2171332C1 |
METHOD FOR ERECTING TEMPORARY ICE BRIDGE | 2000 |
|
RU2171333C1 |
Authors
Dates
2000-05-27—Published
1999-05-20—Filed