FIELD: control of ice coating, especially on transport facilities. SUBSTANCE: according to first version, method consists in placing the layer above bed with warmth- keeping coat above it; prior to placing this layer, distributing grid is mounted above bed and tubular filters are mounted in bed for reducing specific pressure on soft ground of ice coating field and facilitated discharge of above-frost water to stream bed. In passing water flows in constrained areas, for example through hole in bridge, second version of method is proposed which consists in placing the layer above bed with warmth-keeping layer above it; layer is made in form of triangular box divided into sections by means of vertical shutters made from well filtrating material. EFFECT: enhanced efficiency and reliability of passage of water flows; low cost of method due to use of local materials. 3 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR PREVENTION OF ICE-LAID DEPOSIT ON SLOPES IN LOW-SNOW REGIONS OF SPREADING OF PERMAFROST | 1998 |
|
RU2152483C1 |
METHOD FOR ICE-FREE WATER PASSAGE IN UNDER-BRIDGE CHANNELS OF SMALL BRIDGES | 2014 |
|
RU2590912C2 |
CULVERT UNDER EMBANKMENT IN PERMAFROST SOILS AT PERIODICALLY OPERATING WATERWAY | 2008 |
|
RU2370590C1 |
HYDROTECHNICAL CHANNEL DEEPENED INTO PERMAFROST SOILS OF SLOPE AND METHOD OF ITS DEVELOPMENT | 2009 |
|
RU2385986C1 |
SYSTEM TRAPPING DISCHARGES FROM TAILING DUMPS ON PERMAFROST GROUNDS | 2001 |
|
RU2223362C2 |
METHOD FOR PROTECTING ENGINEERING STRUCTURES FROM DEFORMATIONS CAUSED BY CRYO-SOLAR FLUCTUATING SHIFTING OF GROUND MATTER | 1998 |
|
RU2135696C1 |
0 |
|
SU242216A1 | |
PIPE CULVERT UNDER BANKED EARTH IN CONDITIONS OF NORTHERN CLIMATIC BUILDING ZONE AND OPERATION METHOD THEREOF | 2009 |
|
RU2381328C1 |
LEACHING COMPONENT OF HEAP LEACHING PLANT IN CONTINUOUS PERMAFROST ZONE (VERSIONS) | 2010 |
|
RU2448244C1 |
CULVERT IN CONDITIONS OF PERMANENTLY FROZEN SOILS ON PERIODIC WATER COURSE | 2008 |
|
RU2375519C1 |
Authors
Dates
2000-06-20—Published
1998-03-25—Filed