FIELD: oil production with use of electric stimulation of oil formation. SUBSTANCE: plant consists of cased well and electrode installed in well on pipe string. Electrode is made in the form of pipes connected by couplings with centralizer, contactors and terminals. Cable conductors are connected to terminals. To extend zone of stimulation, grounding is used in the form of casing strings of several well which encircle the well in which electrode is installed. Cable is connected to DC source, and successive transmission of pulse maximum of rectified voltage is effected to contactors. Pipes used for formation of electrode may be manufactured from nonconductive material. EFFECT: higher efficiency of treatment due to pulse stimulation of formation with voltage waves and extended zone of treatment. 3 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD AND DEVICE FOR LIQUIDATION OF PARAFFIN-CRYSTALLOHYDRATE PLUG IN WELLS | 1998 |
|
RU2132452C1 |
METHOD FOR EXTRACTING AN OIL DEPOSIT | 2003 |
|
RU2241118C1 |
METHOD OF ELIMINATING PARAFFIN-CRYSTAL HYDRATE PLUG IN WELLS | 2000 |
|
RU2168002C1 |
METHOD OF SEALING THE CASING STRING-BOREHOLE ANNULUS | 2000 |
|
RU2165005C1 |
0 |
|
SU56026A1 | |
CONNECTION DEVICE TO CONNECT TELEMETERING SYSTEM RADIATOR WITH DOWN-HOLE INSTRUMENT | 2004 |
|
RU2278970C1 |
PROCEDURE FOR PERFORATION OF SECTION OF PIPE IN WELL AND DEVICE FOR ITS IMPLEMENTATION | 2009 |
|
RU2414588C1 |
METHOD AND APPARATUS FOR ELECTRICAL CASED WELL LOGGING | 2005 |
|
RU2536732C2 |
METHOD AND DEVICE FOR LATERAL CORING FROM THE WALL OF A NON-CENTERED SECTION OF A CASING STRING IN AN INCLINED WELL | 2022 |
|
RU2781975C1 |
METHOD OF PULSE AND ION-PLASMA STIMULATION OF OIL FORMATION | 2001 |
|
RU2213860C2 |
Authors
Dates
2000-06-20—Published
1998-04-24—Filed