FIELD: repair and sealing operations on wells of oil and gas deposits, particularly, methods of recovery of seal of casing-string-borehole annulus. SUBSTANCE: method consists in treatment of casing string in interval of securing of casing string-borehole annulus with variable polarity of electric current with its density of 20-40 A/sq.m. Simultaneously, treatment is additionally carried out with variable polarity electric current and its periodically varying density from 1 to 20 A/sq.m. In doing so, time for treatment with current of positive polarity exceeds that for treatment with current of negative polarity. EFFECT: higher efficiency of sealing of casing string-borehole annulus and elimination of flows-over in casing string-borehole annulus. 2 dwg, 1 ex
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR SURVEYING TECHNICAL STATE OF WELL, AND DEVICE FOR METHOD'S IMPLEMENTATION | 2008 |
|
RU2389873C1 |
CONSTRUCTION METHOD OF DEEP WELL, PLUGGING SOLUTION FOR ITS IMPLEMENTATION AND STRUCTURE OF DEEP WELL | 2008 |
|
RU2386787C9 |
METHOD OF RECOVERY AND MAINTENANCE OF WELL PRODUCTIVITY | 2002 |
|
RU2215126C2 |
WELL KILLING METHOD | 2004 |
|
RU2283942C2 |
METHOD FOR ISOLATION OF NON-PRESSURIZED RANGE OF COLUMN IN A WELL | 2004 |
|
RU2254443C1 |
METHOD FOR COMPLEX ASSESSMENT OF WELLS CEMENTING QUALITY AND ISOLATION OF RESERVOIR BEDS | 2007 |
|
RU2405936C2 |
SEALING OF PIPE AND STRING CLEARANCE | 2002 |
|
RU2223386C2 |
METHOD FOR TREATMENT OF FACE-ADJACENT WELL AREA | 2004 |
|
RU2244808C1 |
METHOD OF SECONDARY CEMENTING OF PROCESS WELL OF UNDERGROUND RESERVOIRS OF VARIOUS PURPOSE | 2012 |
|
RU2485283C1 |
PROCEDURE FOR PERFORATION OF SECTION OF PIPE IN WELL AND DEVICE FOR ITS IMPLEMENTATION | 2009 |
|
RU2414588C1 |
Authors
Dates
2001-04-10—Published
2000-09-27—Filed