FIELD: gas and oil producing industry; applicable in forecast evaluation of value of period between cleanings of wells based on one control criterion. SUBSTANCE: control criterion is used in form of refractive index of pumped oil. For which purpose, relationship between refractive index of pumped oil and critical quantity of pumped oil for wells of same object is constructed. Using this relationship, total quantity of pumped oil is determined. With consideration for water cutting of oil, total quantity of pumped fluid is calculated. With consideration of well operating conditions, time is calculated for which this quantity of fluid may be pumped through well. Construction of relationship between refractive index of pumped oil and critical quantity of pumped oil is periodically repeated. EFFECT: provided forecast evaluation of period between well cleanings on basis of simple operations. 2 cl, 1 dwg, 1 tbl
Title | Year | Author | Number |
---|---|---|---|
METHOD OF PREVENTION OF FORMATION OF ASPHALT-RESINPARAFFIN ACCUMULATIONS | 2000 |
|
RU2170812C1 |
METHOD FOR EXTRACTING OIL UNDER COMPLICATED CONDITIONS | 2002 |
|
RU2237798C2 |
METHOD OF DEVELOPMENT OF OIL DEPOSIT | 1999 |
|
RU2172395C2 |
METHOD OF WELL OPERATION | 1997 |
|
RU2142554C1 |
METHOD OF DEVELOPING WATER-FLOODED OIL POOL | 2000 |
|
RU2179234C1 |
METHOD FOR SECONDARY OPENING OF PRODUCTIVE BED | 1996 |
|
RU2118446C1 |
METHOD OF DEVELOPMENT OF POOLS OF HEAVY OILS AND BITUMENS WITH USE OF STEAM | 1999 |
|
RU2172398C2 |
METHOD FOR DEVELOPMENT OF WATER-OIL BED | 1998 |
|
RU2146760C1 |
METHOD OF ACID TREATMENT OF OIL FORMATION | 1999 |
|
RU2172401C2 |
METHOD OF DIFFERENTIATED DETERMINATION OF FILTRATION PARAMETERS OF JOINTLY OPERATED PRODUCING FORMATIONS | 1999 |
|
RU2172404C2 |
Authors
Dates
2000-10-27—Published
1999-08-10—Filed