FIELD: oil extractive industry.
SUBSTANCE: method includes extraction of well liquid, paraffin removal, determining debit of well liquid and determining optimal number of days of inter-cleaning period for well equipment on basis of at least two control steps of well operation. Every day debit of well liquid is measured and every day decrease of oil debit relatively to oil debit at the beginning of first control step of oil operation is determined. Total losses are determined, connected to decrease of debit, and costs of paraffin removal by thermal or chemical treatment of well. At the moment of even costs inter-cleaning period for well equipment is determined for first control step of well operation. Following paraffin removal process is performed by means of thermal or chemical well treatment. Then, all mentioned operations are performed at second control step of well operation. Optimal number of days for inter-cleaning period for well equipment is determined at the moment of lowering of oil debit down to average value at the end of first and second control steps of well operation. Inter-cleaning period for well equipment for each control operation step is determined on basis of formula.
EFFECT: higher effectiveness of oil extraction under complicated conditions and lesser operation costs.
2 tbl, 1 ex
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR CONTROL OF ASPHALT-RESIN-PARAFFIN DEPOSITS FORMATION IN LIFT PIPES DURING GASLIFT OPERATION OF WELLS | 2021 |
|
RU2755778C1 |
METHOD OF PREVENTION OF FORMATION OF ASPHALT-RESINPARAFFIN ACCUMULATIONS | 2000 |
|
RU2170812C1 |
METHOD OF EVALUATION OF PERIOD BETWEEN CLEANINGS WELLS COMPLICATED WITH ASPHALT-RESIN-PARAFFIN ACCUMULATIONS | 1999 |
|
RU2158354C1 |
METHOD FOR INCREASING THE EFFICIENCY OF HYDRODYNAMIC METHODS FOR INCREASING THE PETROLEUM RECOVERY OF A RESERVOIR | 2020 |
|
RU2759143C1 |
METHOD FOR COMBATING ASPHALT, RESIN, AND PARAFFIN DEPOSITS IN OIL FIELD EQUIPMENT DURING WELL OPERATION | 2023 |
|
RU2809415C1 |
METHOD FOR PROTECTING WELL EQUIPMENT FROM SEDIMENTATION OF ASPHALT-RESIN-PARAFFIN SUBSTANCES | 2005 |
|
RU2293840C1 |
METHOD FOR BRINGING FORMATION-WELL-PUMP SYSTEM INTO EFFECTIVE OPERATING MODE WITH THE USE OF INDICATOR DIAGRAM | 2004 |
|
RU2283425C2 |
METHOD FOR DEVELOPING FRACTURED-CAVERNOSIC DEPOSIT WITH GAS CAP AND UNDERLYING WATER | 2022 |
|
RU2808627C1 |
METHOD OF OIL RECOVERY | 1995 |
|
RU2078910C1 |
METHOD OF REAL-TIME CONTROL OF RESERVOIR FLOODING | 2015 |
|
RU2614338C1 |
Authors
Dates
2004-10-10—Published
2002-11-25—Filed