FIELD: thermal engineering. SUBSTANCE: power plant has steam turbine with heating-steam bleedoffs, main heating- system heaters whose line carrying medium being heated is connected to heating-system pipeline and that conveying heating medium, to heating-steam bleedoffs, peak water boiler, heating-network makeup pipeline connected to heating- system line upstream of main heating-system heaters, feedwater path running to steam boilers incorporating full-flow condensate pipeline, feedwater pipeline, and high-pressure deaerator, as well as steam-boiler additional feedwater pipeline connected to feedwater path. Peak water boiler is connected to heating-system pipeline downstream of main heating-system heaters through water-cooled surface heat exchanger whose heating-medium line is connected to closed-loop pipes of water boiler; makeup water pipeline of the latter is connected to additional feedwater pipeline and to closed-loop lines upstream of circulating pump of this loop. EFFECT: improved reliability and economic efficiency of power plant. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
THERMAL POWER PLANT | 1999 |
|
RU2159337C1 |
THERMAL POWER PLANT OPERATING PROCESS | 1999 |
|
RU2164604C1 |
THERMAL POWER PLANT OPERATING PROCESS | 1999 |
|
RU2164605C1 |
THERMAL POWER PLANT | 1999 |
|
RU2164606C1 |
METHOD OF OPERATION OF THERMAL POWER STATION | 1999 |
|
RU2166645C1 |
METHOD FOR OPERATION OF BINARY COMBINED CYCLE POWER PLANT | 2016 |
|
RU2631961C1 |
METHOD OF WORK OF BINARY STEAM HEAT ELECTROCENTRAL | 2016 |
|
RU2626710C1 |
THERMAL POWER STATION | 2001 |
|
RU2220286C2 |
METHOD OF OPERATION OF THERMAL POWER STATION | 2001 |
|
RU2214518C2 |
METHOD OF OPERATION OF THERMAL POWER STATION | 2001 |
|
RU2214523C2 |
Authors
Dates
2000-11-20—Published
1999-11-19—Filed