FIELD: thermal engineering. SUBSTANCE: peak-power source of plant is peak-demand surface steam-to-water heat exchanger whose heating path is connected to industrial extraction stage of steam turbine and water-cooled water heater is connected to heating-system pipeline downstream of main heating-system heaters; heating line of water- cooled water heater is connected to condensate line of peak-demand surface steam-to-water heat exchanger. Heating-medium outlet pipeline running from main water-cooled water heater is connected to turbine-condensate line between second and third low-pressure heaters as counted along condensate flow. EFFECT: improved reliability and economic efficiency of plant; increased power for heat generation. 2 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF OPERATION OF THERMAL POWER STATION | 1999 |
|
RU2166645C1 |
THERMAL POWER PLANT | 1999 |
|
RU2159337C1 |
THERMAL POWER PLANT | 1999 |
|
RU2159336C1 |
THERMAL POWER PLANT OPERATING PROCESS | 1999 |
|
RU2164605C1 |
THERMAL POWER PLANT OPERATING PROCESS | 1999 |
|
RU2164604C1 |
THERMAL POWER STATION | 2001 |
|
RU2214516C2 |
METHOD OF OPERATING THERMAL POWER STATION | 2000 |
|
RU2174181C1 |
THERMAL POWER STATION | 2000 |
|
RU2174183C1 |
METHOD OF OPERATION OF THERMAL POWER STATION | 2001 |
|
RU2214518C2 |
METHOD FOR OPERATION OF THERMAL POWER STATION | 2001 |
|
RU2214521C2 |
Authors
Dates
2001-03-27—Published
1999-12-10—Filed