FIELD: oil producing industry; applicable in operations involved in lifting of well product in well completion and operation. SUBSTANCE: method includes bailing-up of well with airtight wellhead. Bailer is lowered into well to under oil level and lifted up to wellhead. Operation is carried out with airtight wellhead, and fluid is forced out from bailer to accumulation system. Bailer accommodates plunger with valve connected with pulling member. Bailer is lowered into well with plunger raised up to upper limit. After fixing of bailer relative to wellhead, plunger is lowered down to bailer bottom with fluid flowing over to bailer above space of plunger, and fluid is displaced from said space into system of product accumulation by raising plunger in bailer up to stop. EFFECT: higher efficiency of method. 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF COMPLETION AND OPERATION OF WELLS | 1998 |
|
RU2151277C1 |
DEVICE FOR LIFTING LIQUID FROM WELL | 1998 |
|
RU2150576C1 |
HYDRAULIC HAMMER | 2000 |
|
RU2162508C1 |
OIL-WELL SUCKER-ROD PUMP DRIVE | 1998 |
|
RU2150607C1 |
SWAB | 1998 |
|
RU2142578C1 |
METHOD OF TREATING BOTTOM ZONES OF WELLS PRODUCING HEAVY AND DEAD OILS | 1999 |
|
RU2162517C1 |
METHOD OF DEVELOPING DEPOSITS OF HIGH-VISCOSITY OILS AND NATURAL BITUMENS USING IN-SITU COMBUSTION | 1999 |
|
RU2162518C1 |
METHOD OF DEVELOPMENT OF HEAVY OIL AND NATURAL BITUMEN FIELDS | 1998 |
|
RU2151862C1 |
METHOD FOR WELL DEVELOPMENT AND OPERATION AND DEVICE FOR ITS IMPLEMENTATION | 2012 |
|
RU2503798C2 |
DEVICE FOR TREATING DOWN-HOLE ZONE OF WELL | 1995 |
|
RU2102577C1 |
Authors
Dates
2000-12-20—Published
1999-06-29—Filed