FIELD: railway transport. SUBSTANCE: proposed railway system has gauge of 2.5 m or larger. Each side of gauge has two paired rails. Wheelsets of rail vehicle have flange in middle and two wheels at sides resting on two paired rails of track. EFFECT: increased speed of railway carriage and load-carrying capacity, improved stability of trains.
Title | Year | Author | Number |
---|---|---|---|
METHOD OF TRANSPORT OVERCOMING OF WATER OBSTACLE IN AREAS OF ETERNAL CONGELATION | 2016 |
|
RU2641810C2 |
METHOD OF SUPER-HIGH-SPEED IN-MEGAPOLIS PASSENGER AND FREIGHT CONVEYANCE OF HIGHER ANTI-TERRORISM SECURITY | 2009 |
|
RU2503560C2 |
METHOD FOR VEHICLE OVERCOMING OF WATER OBSTACLES | 2014 |
|
RU2586424C2 |
SINGLE-AXLE RAILWAY BOGIE | 2000 |
|
RU2196058C2 |
HIGH-SPEED RAILWAY TRAIN | 2009 |
|
RU2454340C2 |
METHOD OF HIGH-SPEED RAILROAD TRAIN MOTION | 2008 |
|
RU2361759C1 |
LAND INSEPARABLE TRANSPORT AND ENERGY SYSTEM | 2022 |
|
RU2789916C1 |
UNMANNED AERIAL MEASURING COMPLEX | 2022 |
|
RU2798159C1 |
HIGH-SPEED GROUND TRANSPORT SYSTEM | 2001 |
|
RU2252880C2 |
ROLLING STOCK WHEEL PAIR DEFECT CONTROL SYSTEM | 2023 |
|
RU2818020C1 |
Authors
Dates
2001-03-27—Published
1998-07-31—Filed