FIELD: oil producing industry; applicable in development of oil pool with impermeable partitions between formations. SUBSTANCE: method includes injection of working agent through injection wells and oil withdrawal through producing wells. Map of impermeable partitions between adjacent formations is constructed. Formation and section with sufficient thickness of impermeable partitions are selected with wells located thereon. Additional injection well is drilled on selected formation and section up to impermeable partition. Additional well is located between existent producing wells. Working agent is injected through additional injection well and other injection wells located on section. EFFECT: higher oil recovery from pool. 1 ex
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR DEVELOPMENT OF OIL DEPOSIT | 1997 |
|
RU2105873C1 |
METHOD FOR DEVELOPMENT OF OIL DEPOSIT | 1997 |
|
RU2105870C1 |
METHOD FOR DEVELOPMENT OF OIL DEPOSIT | 1997 |
|
RU2105871C1 |
METHOD OF OIL POOL DEVELOPMENT | 2001 |
|
RU2178066C1 |
METHOD OF DEVELOPMENT OF FLOODED OIL POOL | 1997 |
|
RU2136863C1 |
METHOD OF OIL POOL DEVELOPMENT | 2001 |
|
RU2181831C1 |
METHOD FOR DEVELOPMENT OF OIL DEPOSIT | 1995 |
|
RU2103486C1 |
METHOD OF DEVELOPING NONUNIFORM OIL FORMATION | 1998 |
|
RU2149986C1 |
METHOD FOR EXTRACTING OIL DEPOSIT WITH CARBONATE MANIFOLDS OF LOW PRODUCTIVENESS | 2002 |
|
RU2227207C2 |
METHOD FOR DEVELOPMENT OF OIL DEPOSIT | 1997 |
|
RU2108451C1 |
Authors
Dates
2001-05-10—Published
2000-09-19—Filed