FIELD: oil producing industry. SUBSTANCE: method involves additional research of elastic properties of displacement agent and displaced fluid and porous medium for compressibility; gathering of field production process data on operation of each well. On the basis of gathered data, mathematical modelling of filtration process is performed with acceptable degree of coincidence of rated and actual production process parameters and construction of mathematical model of selected region of oil pool. On the basis of constructed mathematical model for definite dates, maps of isobars and pressures gradients fields are constructed and sections of maximum area with slightly varied in time boundaries are determined and with minimum fluid consumption through vertical section. In the second version, additional data on geological structure of formation are gathered. On the basis of gathered data, map of hydraulically associated regions of formation is constructed together with maps of isobars and pressure gradient fields, and also permeability field is constructed by mathematical model. EFFECT: higher efficiency and confidence of method of control over development of oil deposit due to nonstationary filtration processes and determination of hydrodynamically isolated deposit sections. 2 cl, 4 dwg, 2 tbl, 1 ex
Title | Year | Author | Number |
---|---|---|---|
METHOD OF DEVELOPMENT OF OIL DEPOSIT WITH NONUNIFORM STRATIFIED FORMATIONS WITH HELP OF CONTROL OVER FIELDS OF PRESSURES | 1999 |
|
RU2166619C1 |
METHOD OF CONTROL OVER DEVELOPMENT OF OIL DEPOSIT WITH FORMATIONS NONUNIFORM IN BEDDING | 1998 |
|
RU2148169C1 |
METHOD OF MONITORING DEVELOPMENT OF OIL DEPOSIT WITH NONUNIFORM STRATIFIED FORMATIONS | 2000 |
|
RU2183268C2 |
METHOD OF FORMATION COVERAGE EVALUATION BY DEVELOPMENT SYSTEM | 2019 |
|
RU2717326C1 |
METHOD FOR CONTROL OF FILTRATION FLOWS CREATED AT DEVELOPMENT OF OIL DEPOSITS WITH STRATIFIED-NONUNIFORM BEDS | 1995 |
|
RU2092691C1 |
METHOD OF CONTROL OVER OIL DEPOSIT DEVELOPMENT | 2000 |
|
RU2172402C1 |
METHOD FOR ONLINE FORECASTING OF MAIN PARAMETERS OF OIL DEPOSITS DEVELOPMENT | 2011 |
|
RU2480584C1 |
METHOD OF ISOBARIC MAPPING OF ZONE-NONHOMOGENEOUS PRODUCTIVE FORMATION | 2009 |
|
RU2416719C1 |
METHOD OF OIL POOL DEVELOPMENT | 1999 |
|
RU2162141C1 |
METHOD OF REDUCING WATER CUTTING OF PRODUCTION OF OIL-PRODUCING WELLS | 1999 |
|
RU2161246C1 |
Authors
Dates
2001-05-10—Published
1999-09-03—Filed