FIELD: mining industry; applicable in underground mineral mining with use of drilling and blasting operations. SUBSTANCE: method includes formation of vertical compensation microchambers located by square pattern with square side determined by offered formula. Microchambers are driven through entire height of horizon with a base in lower part in the form of truncated cone up to 1/3 of height of mined ore mass with volume ensuring loosening factor of 1.3-2. Breakage of rock mass onto compensation space and clamping medium is carried out by vertical concentrated charges of explosives located between microchambers in central part of districts of ore mass limited by microchambers with effective range determined by offered formula. EFFECT: reduced losses of holes, improved safety of mining operations due to preserved stability of caved ore mass. 3 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF MINING THICK ORE DEPOSITS | 2001 |
|
RU2197615C2 |
PROCESS OF UNDERGROUND DEVELOPMENT OF THICK ORE DEPOSITS | 2001 |
|
RU2203419C2 |
METHOD OF MINING OF THICK ORE DEPOSITS | 2000 |
|
RU2186979C2 |
METHOD FOR BLASTING OF ROCK MASS | 1994 |
|
RU2134402C1 |
METHOD FOR EXPLOSIVE DESTRUCTIONS OF ORE MASSIVES HAVING FRACTURED MESH STRUCTURE | 2002 |
|
RU2236590C2 |
METHOD OF MINING ORE DEPOSITS | 0 |
|
SU1642001A1 |
METHOD OF MINING MINERAL DEPOSITS | 0 |
|
SU1330315A1 |
METHOD FOR EXTRACTING ORE BLOCKS, CUT BY SUBVERTICAL POST-ORE DIKE | 2003 |
|
RU2238408C1 |
METHOD OF MINING SLOPING ORE DEPOSITS | 0 |
|
SU1620628A1 |
PROCESS OF DESTRUCTION OF PILLARS | 2000 |
|
RU2175434C2 |
Authors
Dates
2001-09-10—Published
1999-12-02—Filed