FIELD: building industry, main pipe-lines repair. SUBSTANCE: before filling the repairing part of the pipe-line packets of the pipe-line are filled up with inert material which is preliminarily packed for 5-7 hours. The inert material, for example, sand or sand-gravel mixture is hardly packed when being wet. The bottom part of the profile and the periphery zone of stress-corrosion risk are provided with coffer-dams made from inert material, for example, from sand-gravel mixture. EFFECT: reduced probability of corrosion cracking under the pressure of the repaired part of the pipe-line. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
PIPELINE RESTORATION METHOD | 1999 |
|
RU2195599C2 |
METHOD OF PIPELINE REPAIR | 2012 |
|
RU2493472C1 |
PASSAGE OF PIPE LINE THROUGH WATER OBSTACLE | 2000 |
|
RU2195596C2 |
METHOD OF REVEALING SECTION OF MAIN PIPE LINES PREDISPOSED TO CORROSION CRACKING UNDER STRESS (STRESS CORROSION) | 1999 |
|
RU2147098C1 |
METHOD OF DETECTION OF GAS LINE SECTIONS LIABLE TO CORROSION CRACKING UNDER STRESS | 2001 |
|
RU2193718C2 |
METHOD OF PIPELINE REPAIR (VERSIONS) | 2004 |
|
RU2332610C2 |
METHOD OF DETECTION OF GAS LINES SUBJECTED TO CORROSION CRACKING UNDER STRESS | 2001 |
|
RU2216681C2 |
METHOD OF CHECKING PIPELINE PREDISPOSED TO CORROSION CRACKING UNDER LOADS | 2004 |
|
RU2332609C2 |
REPAIR OF POTENTIALLY DANGEROUS PIPELINE SECTION | 2013 |
|
RU2554172C2 |
METHOD OF DETECTING SECTIONS OF MAIN GAS PIPELINES PRONE TO STRESS CORROSION CRACKING | 2016 |
|
RU2633728C1 |
Authors
Dates
2001-11-10—Published
2000-11-22—Filed