FIELD: construction engineering; erection of pipe lines crossing water obstacles. SUBSTANCE: pipe line is ballasted and filling is reinforced with utilized tires laid at reduced sizes to banking. Dam is erected down- stream. Mark of inlet end of water transfer pipe is positioned at level of upper generatrix of pipe line banking. EFFECT: enhanced reliability. 2 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
UNDERWATER PIPELINE PROTECTION AND SECURING DEVICE | 2023 |
|
RU2818136C1 |
TRANSITION OF PIPELINE THROUGH WATER OBSTACLE | 2015 |
|
RU2590930C1 |
PIPE LINE PASS UNDER AUTOMOBILE ROAD | 1998 |
|
RU2186281C2 |
METHOD OF PIPE-LINE REPAIR | 2000 |
|
RU2175736C1 |
DEVICE FOR PROTECTION AND FIXATION OF PIPELINE | 2021 |
|
RU2793804C1 |
PIPELINE LAID UNDER AUTOMOBILE ROAD | 1997 |
|
RU2162979C2 |
METHOD OF REPAIRING SLUGGED OR ERODED SECTION OF PIPELINE | 2004 |
|
RU2285186C2 |
BRIDGES | 0 |
|
SU1663084A1 |
WATER CURRENT OVERPASS | 2006 |
|
RU2303676C1 |
CULVERT UNDER THE EMBANKMENT | 2017 |
|
RU2660699C1 |
Authors
Dates
2002-12-27—Published
2000-03-20—Filed