METHOD AND DEVICE FOR STARTING GAS-TURBINE POWER PLANT AND FEEDING IT WITH GAS Russian patent published in 2002 - IPC

Abstract RU 2182247 C2

FIELD: power engineering. SUBSTANCE: method includes accelerating turbocompressor and turbine coupled rotors and booster compressor to starting speed by means of external starting motor, disconnecting external starting motor from rotor by means of disengaging clutch as soon as rotor gains starting speed, and accelerating turbocompressor rotor as well as free power turbine rotor to full speed. As soon as turbocompressor rotor gains rated speed, rigidly coupled rotors of booster compressor and driving gas turbine are uncoupled by means of additional disengaging clutch from turbocompressor rotor. Turbocompressor and power turbine rotors are brought to full speed simultaneously with acceleration of booster compressor and driving turbine rotors to high operating speeds of 15 000 to 20 000 rpm. Gas-turbine plant has external starting motor, booster compressor, turbocompressor with turbine, disengaging clutch mounted between booster compressor and external starting motor, power turbine, and also driving gas turbine placed between booster compressor and turbocompressor, as well as additional disengaging clutch. EFFECT: enhanced economic efficiency and reliability, reduced size and cost of gas-turbine plant. 2 cl, 1 dwg

Similar patents RU2182247C2

Title Year Author Number
METHOD OF STARTING AND GAS SUPPLY OF POWER GENERATING GAS TURBINE PLANT 1994
  • Denisov I.N.
  • Shelud'Ko L.P.
RU2111370C1
METHOD AND DEVICE FOR STARTING AND SUPPLYING GAS TO GAS-TURBINE POWER PLANT 1999
  • Denisov I.N.
  • Klimnjuk Ju.I.
  • Krasheninnikov A.V.
  • Postnikov A.M.
  • Fedorchenko D.G.
  • Tsybizov Ju.I.
  • Shelud'Ko L.P.
RU2186224C2
COMBINED-CYCLE PLANT 1996
  • Denisov I.N.
  • Shelud'Ko L.P.
RU2142565C1
PROCEDURE FOR POWER GAS-TURBINE INSTALLATION START-UP 2007
  • Korenevskij Lev Gdalievich
  • Pojarkov Viktor Viktorovich
  • Judovin Boris Isaakovich
  • Bogoradovskij Gennadij Iosifovich
RU2380560C2
METHOD OF START AND GAS SUPPLY TO ELECTRICAL GREEN GAS TURBINE PLANT AND DEVICE FOR ITS REALISATION 2014
  • Datsenko Vasilij Vladimirovich
  • Zejgarnik Jurij Al'Bertovich
  • Kosoj Anatolij Aleksandrovich
  • Kosoj Aleksandr Semenovich
RU2573857C2
METHOD AND DEVICE FOR MICRO GAS TURBINE STARTING AND COOLING BY STARTING COMPRESSOR WITH AIR VALVE 2013
  • Gusarov Valentin Aleksandrovich
  • Eronin Sergej Fedorovich
  • Kulagin Jaroslav Vladimirovich
RU2523084C1
OPERATION METHOD OF A COMPRESSOR STATION OF MAIN GAS PIPELINES 2015
  • Khrustalev Vladimir Aleksandrovich
  • Larin Evgenij Aleksandrovich
  • Novikova Margarita Vitalevna
RU2647742C2
METHOD FOR OPERATION OF A COMBINED GAS PUMPING SET OF THE COMPRESSOR STATION OF A MAINS GAS LINE 2021
  • Livshits Mikhail Yurevich
  • Sheludko Leonid Pavlovich
RU2778421C1
STARTING SYSTEM OF GAS TURBINE ENGINE 2018
  • Andropov Artem Sergeevich
  • Erokhin Sergej Konstantinovich
  • Ivanov Nikolaj Mikhajlovich
  • Lazovskaya Kseniya Valerevna
  • Slitskij Aleksandr Evgenevich
RU2670997C1
TWO-ROTOR AIR COMPRESSOR FOR COMBINED-CYCLE PLANTS 2012
  • Zarjankin Arkadij Efimovich
  • Zarjankin Vladislav Arkad'Evich
  • Arianov Sergej Vladimirovich
  • Mager Aleksandr Sergeevich
RU2529296C2

RU 2 182 247 C2

Authors

Shelud'Ko L.P.

Denisov I.N.

Krasheninnikov A.V.

Dates

2002-05-10Published

1999-04-27Filed