FIELD: opencast mineral mining; applicable in opencast worked by benches during technical reequipment and reconstruction. SUBSTANCE: method includes stopping of all mining operations on even benches when counting from below and equipment is withdrawn; working of odd benches up to their complete reclamation and formation of doubled benches with increasing height of benches more than width of their working platforms; working of doubled benches. The method makes it possible not to stop mining operations during reconstruction of working flank and to replace excavation equipment with more effective one. EFFECT: higher efficiency. 3 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
LOADING DRAGLINE EXCAVATOR | 2000 |
|
RU2186178C1 |
METHOD FOR OPEN EXPLOITATION OF DRAWN TOGETHER INCLINED MINERAL SEAM | 1994 |
|
RU2062879C1 |
METHOD OF RECONSTRUCTION OF DEEP OPEN MINES | 0 |
|
SU1647138A1 |
METHOD FOR WORKING BENCH BY THIN HORIZONTAL LAYERS | 1996 |
|
RU2119056C1 |
METHOD OF OPEN WORKING OUT OF STEEP DEPOSITS OF PLATFORM SHAPE | 2013 |
|
RU2528704C1 |
METHOD OF COMBINED DEVELOPMENT SCHEME FOR MINERAL DEPOSITS | 0 |
|
SU1700236A1 |
METHOD OF OPEN MINING OF STEEPLY PITCHING FIELDS OF AREAL FORM USING HYDRAULIC BACKHOE EXCAVATORS | 2015 |
|
RU2574749C1 |
METHOD FOR RECONSTRUCTING QUARRY WITH TWO PROXIMATE ORE BODIES | 2002 |
|
RU2230192C1 |
METHOD OF OPENCAST RECONSTRUCTION | 0 |
|
SU1710754A1 |
DRAGLINE-EXCAVATOR BUCKET | 1995 |
|
RU2078875C1 |
Authors
Dates
2002-05-27—Published
2000-04-06—Filed