FIELD: mining; applicable in mineral opencast mining. SUBSTANCE: method includes drilling of holes of slot, loading of holes with explosive charges and their blasting with subsequent working of contour strip. Holes are drilled by drilling machine whose longitudinal axis is positioned at angle to slot stretching. Said angle value is determined by formula γ = arcsin(tgα/tgβ), where γ is angle between machine longitudinal axis and slot stretching direction, deg; α is angle of inclination of drilling machine rod, deg; β is angle of inclination of prepared slope, deg. Minimal width of berm is determined by formula L = asinγ+0,5bcosγ+c, where L is minimal width of berm, m; a is length of drilling machine, m; b is drilling machine width, m; c is safe distance from drilling machine to overlying slope, m. EFFECT: higher efficiency of drilling equipment operation in making of slopes, extended range of angles of inclination of bank slopes. 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF ROCKS WORKING IN OPENCAST RECONSTRUCTION | 2001 |
|
RU2192544C2 |
METHOD OF SLOT GROUND WATER LEVEL LOWERING ON OPENCASTS | 2001 |
|
RU2187649C1 |
METHOD OF FORMATION OF OPENCAST NONMINING FLANK IN ARGILLACEOUS ROCKS | 2001 |
|
RU2208163C1 |
METHOD FOR PROTECTION OF SAFETY BENCH IN OPEN PIT | 1991 |
|
RU2023159C1 |
PROCESS OF ARRANGEMENT OF HIGH WALLS IN OUTLINE OF STRIPPING | 2002 |
|
RU2224110C1 |
METHOD OF SLOPING HIGH BENCHES ON OPENCAST LIMITING CONTOUR | 2000 |
|
RU2178079C1 |
METHOD FOR SLOPING OF BENCHES | 1991 |
|
RU2068094C1 |
QUARRY DEVELOPMENT METHOD | 1996 |
|
RU2118456C1 |
METHOD OF COMBINED MINING OF MINERAL DEPOSITS IN OPENCAST CONTOUR ZONE | 2000 |
|
RU2187643C2 |
METHOD OF DUMPING ON INCLINED BASE | 2002 |
|
RU2211333C1 |
Authors
Dates
2002-08-10—Published
2001-01-03—Filed