FIELD: mining; applicable in opencast mining of water-bearing mineral deposits, particularly, in drainage of working platforms on water-bearing rocks. SUBSTANCE: method includes drilling of holes of drainage slot and loading of holes with borehole sprung-hole charges, blasting of said charges, bypass of water flow from drainage slot to sump. Holes of drainage slot are drilled inclined with angle of inclination taken equal to angle of inclination of working bench slopes. Hole depth is determined by method of calculation. EFFECT: increased stability of slopes of benches and opencast flanks due to reduction of softening effect of water on rocks, reduced cost of ore mining due to replacement of expansive explosives with low-cost ones, for instance, replacement of granotoluene with ammonite 6 ZhV. 2 dwg, 1 ex
Title | Year | Author | Number |
---|---|---|---|
METHOD OF SLOT MAKING IN FORMATION OF BANK SLOPES IN OPENCASTS | 2001 |
|
RU2186983C1 |
METHOD OF ROCKS WORKING IN OPENCAST RECONSTRUCTION | 2001 |
|
RU2192544C2 |
METHOD OF FORMATION OF OPENCAST NONMINING FLANK IN ARGILLACEOUS ROCKS | 2001 |
|
RU2208163C1 |
METHOD OF WATER REDUCTION AT EXPLOSIVE PREPARATION TO EXTRACTION OF WATERED MASSIF | 2018 |
|
RU2685722C1 |
METHOD FOR DRILLING AND BLASTING OPERATIONS IN OPEN CUTS | 1999 |
|
RU2154254C1 |
OPEN-CAST MINING METHOD | 0 |
|
SU1089261A1 |
METHOD OF EXTRACTION OF BEYOND-CONTOUR MINERAL RESERVES UNDER OPENCAST BOTTOM AND IN ITS FLANKS | 2001 |
|
RU2186984C1 |
METHOD OF SUPPORTING OF UNDERGROUND MINE WORKINGS WITH COMBINED SUPPORT | 2002 |
|
RU2215150C1 |
PROCESS OF ARRANGEMENT OF HIGH WALLS IN OUTLINE OF STRIPPING | 2002 |
|
RU2224110C1 |
METHOD FOR ROCK BLASTING IN OPEN PIT | 1992 |
|
RU2044998C1 |
Authors
Dates
2002-08-20—Published
2001-06-05—Filed