FIELD: thermal engineering. SUBSTANCE: power plant has at least one steam turbine with top and bottom steam extraction points connected, respectively, to top and bottom heating-system heaters inserted in delivery-water line, low- pressure heaters inserted in full-flow condensate line, feedwater vacuum deaerator with source-water, heating-medium, and feedwater pipelines, the latter pipeline being inserted in delivery-water line. Connected to source-water pipeline of vacuum deaerator is heater whose heating-medium side communicates with condensate pipeline of bottom heating-system heater. Outlet of heating-medium pipeline of source-water heater is connected to full-flow condensate line upstream of first low-pressure regenerative heater. EFFECT: enhanced reliability and economic efficiency of power plant. 2 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
THERMAL POWER PLANT | 2001 |
|
RU2191265C1 |
THERMAL POWER STATION OPERATING PROCESS | 2001 |
|
RU2184247C1 |
THERMAL POWER PLANT OPERATION PROCESS | 2001 |
|
RU2191266C1 |
THERMAL POWER PLANT | 1998 |
|
RU2148173C1 |
HEAT SUPPLY SYSTEM OPERATING PROCESS | 2000 |
|
RU2181437C1 |
THERMAL POWER STATION | 2001 |
|
RU2184245C1 |
HEAT ELECTRIC POWER PLANT | 2001 |
|
RU2204024C2 |
HEAT SUPPLY SYSTEM OPERATING PROCESS | 2001 |
|
RU2184246C1 |
THERMAL POWER STATION | 2001 |
|
RU2214516C2 |
THERMAL POWER STATION | 2001 |
|
RU2214515C2 |
Authors
Dates
2002-08-10—Published
2001-04-20—Filed