FIELD: geochemical survey to predict oil and gas fields under floor of water area with continuous profiling from specialized vessels. SUBSTANCE: uninterrupted control over constancy of conditions of sample taking with due account of dynamics of vessel's motion, control over speed of flow of water in water line of deaerator, control over rate of supply of carrier gas, realization of synchronous accurate coordinated referencing of observation points and discreteness of analysis of consistent samples of water depending on vessel's speed are executed. EFFECT: increased accuracy, informativity and authenticity of measurements and interpretation of continuous measurements on moving vessel. 9 cl, 5 dwg
Title | Year | Author | Number |
---|---|---|---|
DEVICE FOR MUD LOGGING IN AUGER-DRILLED HOLES DURING DRILLING | 1996 |
|
RU2085729C1 |
METHOD FOR HELIUM SURVEY ON WATER BODIES | 2011 |
|
RU2484503C1 |
METHOD OF HIGH-RESOLUTION SEISMIC PROSPECTING AND SOURCE OF SEISMIC SIGNALS FOR ITS REALIZATION | 2000 |
|
RU2171477C1 |
DEVICE TO DETERMINE QUANTITY OF GASES IN LIQUID | 2012 |
|
RU2499247C1 |
METHOD OF GEOCHEMICAL EXPLORATION | 2012 |
|
RU2525644C2 |
OIL AND GAS DEPOSIT FORECASTING METHOD | 0 |
|
SU972452A1 |
METHOD FOR DETERMINATION OF SPATIAL POSITION OF PIPELINE AT UNDERWATER TRANSITION SECTION | 2021 |
|
RU2786847C2 |
GEOCHEMICAL EXPLORATION METHOD | 2010 |
|
RU2456644C2 |
SYSTEM FOR AUTOMATIC MEASUREMENT OF GAS CONTENT AND VORTEX DEGASSING OF DRILLING FLUID | 2017 |
|
RU2681790C2 |
METHOD OF GEOCHEMICAL PROSPECTING FOR GEOECOLOGICAL MONITORING OF OFFSHORE OIL-AND-GAS-BEARING ZONES | 2012 |
|
RU2513630C1 |
Authors
Dates
2002-08-27—Published
2001-10-04—Filed