FIELD: oil and gas industry, specifically, pumping of flooded oil carrying increased quantities of paraffin, resins and asphaltenes. SUBSTANCE: gear includes tubing string, two screw pumps with common shaft, intake chamber placed opposite to oil- bearing interval, packer insulating producing pool, magnetizing units. Magnetizing units are placed in intake chamber into which water-gas-oil mixture goes from producing pool and take into account physical-chemical properties of this mixture and across inlets of screw pumps. Common shaft of pumps is made of magnetic material. Magnetizing units show different magnetic properties and have stepped internal surfaces. They are mounted with expanded part upwards on upper pump and with expanded part downwards on lower pump. EFFECT: increased operational efficiency of oil production, prolonged interval between well cleanups, reduced usage of materials. 2 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
WELL PUMPING FIXTURE FOR OIL EXTRACTION AND FOR PUMPING WATER INTO BED | 2007 |
|
RU2339794C1 |
WELL PUMP FACILITY FOR OIL PRODUCTION AND WATER INJECTION TO STRATUM | 2007 |
|
RU2334079C1 |
METHOD FOR DEVELOPMENT OF RESERVOIR OF HIGH-VISCOUS OIL | 2009 |
|
RU2405929C1 |
PROCEDURE FOR DEVELOPMENT OF MULTI-PAY OIL DEPOSIT | 2010 |
|
RU2431747C1 |
PROCEDURE FOR DEVELOPMENT OF HIGH VISCOUS OIL DEPOSIT | 2010 |
|
RU2421609C1 |
DEVICE FOR EXTRACTION OF WELL PRODUCT AND WATER PUMPING TO FORMATION | 2010 |
|
RU2443858C2 |
METHOD OF HIGH-VISCOSITY OIL POOL DEVELOPMENT | 2012 |
|
RU2514044C1 |
PLANT FOR BOREHOLE SEPARATION OF WATER-GAS-OIL MIXTURE FROM WATER | 2012 |
|
RU2483211C1 |
METHOD OF SUPER-VISCOUS OIL FIELD DEVELOPMENT | 2017 |
|
RU2690588C2 |
DEVICE FOR EXTRACTING HEAVY VISCOUS OIL | 2005 |
|
RU2299980C1 |
Authors
Dates
2002-09-27—Published
2000-09-19—Filed