FIELD: oil and gas production. SUBSTANCE: process is related to temporary insulation of intervals of active pools, to killing of wells with abnormally low formation pressure for repair of wells, for isolation of lost circulation zones while wells are drilled. Technical result of invention consists in creation of temporary insulation with preservation of collector properties in critical area of formation during well servicing and general overhaul of wells for time period required for improvement of technological parameters of insulation material and reduced cost for realization of process. Process of temporary insulation of interval of active pool includes formation of viscoelastic packer by injection of polymer solution and cross-linking solution into critical area of formation with its subsequent destruction and well completion. Polyacrylamide is employed as polymer material, it is injected into formation simultaneously with cross-linking solution and stabilizer with following proportion of components, mas.%: polyacrylamide, 0.1-5.0; cross-linking solution, 0.05- 10.0; stabilizer, 0.1-5.0; water, the balance. Packer is destroyed by pumping aqueous solution of peroxide compound into critical area of formation. Soluble trivalent salts of chromium, for instance, Cr2(SO4)3, Cr(C2H302)3, CrCl3 can be used in the capacity of cross- linking solution, ammonium chloride can be employed as stabilizer and Na2CO3•H2O3- is peroxide of sodium carbonate, (NH4)2O2S8 is ammonium persulfate, H2O2 is hydrogen peroxide, (NH4)2CO3•H2O3 is carbamide monoperoxide can find use as aqueous solution of peroxide compound. EFFECT: improved technological parameters of insulation material, reduced cost of realization of process. 3 tbl
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR TEMPORARY PRODUCTIVE RESERVOIR INTERVAL PLUGGING | 2005 |
|
RU2306414C2 |
METHOD OF TREATMENT OF BOTTOM-HOLE ZONE OF FORMATION LOW-PRODUCTIVE RESERVOIRS | 2001 |
|
RU2182223C1 |
METHOD FOR TREATING BOTTOM-HOLE ZONE OF LOW-PRODUCTIVE RESERVOIRS IN BED | 1998 |
|
RU2139425C1 |
PROCEDURE LEVELING PROFILE OF ACCEPTANCE OF INJECTION WELLS | 2000 |
|
RU2175053C1 |
METHOD OF INCREASING OIL WELL PRODUCTIVITY | 1999 |
|
RU2177535C2 |
METHOD FOR RESTORING TIGHTNESS OF PRODUCTION STRINGS | 1997 |
|
RU2116432C1 |
METHOD SETTING PROFILES OF ACCEPTANCE OF INJECTION WELLS | 2000 |
|
RU2169836C1 |
METHOD OF HORIZONTAL WELL COMPLETION | 2000 |
|
RU2171359C1 |
METHOD OF DEVELOPMENT OF OIL DEPOSIT PRESENTED BY POROUS-FRACTURED RESERVOIR | 2000 |
|
RU2171368C1 |
METHOD OF TEMPORARY ISOLATION OF RESERVOIR | 2005 |
|
RU2324046C2 |
Authors
Dates
2002-10-10—Published
2001-06-21—Filed