FIELD: gas-and-oil producing industry.
SUBSTANCE: packer is constituted by inserting isolating material into bottomhole formation zone with following destruction and development of borehole cavity. Cement grout with sawdust wood filler is used as isolation material. Bridge made from the same isolating material is installed without pressure as a packer, in the gap of reservoir. Bridge is drilled out. Shield of layer of isolating material is left at internal walls of borehole cavity. Inner diameter of shield is more than external diameter of additional casing pipe which is inserted into borehole cavity with following cementation with backfill. Development of borehole cavity is performed after backfill is bound and additional casing pipe and backfill and isolating material in bottomhole formation zone and internal walls of borehole cavity are perforated.
EFFECT: increased efficacy of technique.
3 dwg
Title | Year | Author | Number |
---|---|---|---|
PROCESS OF TERMINATION OF CONSTRUCTION OF WELLS AND GEAR FOR ITS IMPLEMENTATION | 2000 |
|
RU2165516C1 |
WELL COMPLETION METHOD | 2023 |
|
RU2795281C1 |
DEVELOPMENT METHOD OF WATER-FLOODED OIL DEPOSIT | 2012 |
|
RU2494247C1 |
METHOD AT OPENING WORKING SEAM, FREE AT PERFORATING | 0 |
|
SU1765372A1 |
PROCEDURE FOR DEVELOPMENT OF WATER-FLOODED OIL DEPOSITS | 2010 |
|
RU2420657C1 |
PROCESS OF ISOLATION OF WATER-SATURATED POOLS IN OPERATIONAL WELLS | 2000 |
|
RU2174595C1 |
WATER AND GAS INFLUX LIMITING METHOD WITH WELL PRODUCTIVITY RECOVERY | 2013 |
|
RU2539047C1 |
METHOD OF DEVELOPMENT OF FLOODED OIL DEPOSIT | 2012 |
|
RU2504650C1 |
METHOD FOR ELIMINATING FLOWS BEHIND THE CASING IN A PETROLEUM PRODUCTION BOREHOLE FROM AN UNDERLYING AQUIFER | 2021 |
|
RU2776018C1 |
METHOD FOR WELL REPAIR | 2008 |
|
RU2354802C1 |
Authors
Dates
2008-05-10—Published
2005-08-01—Filed