FIELD: mining industry. SUBSTANCE: method of dismantling of powered cleaning complexes includes construction of dismantling chamber with simultaneous erection of guarding support in the form of supporting members embedded in holes drilled in coal pillar from dismantling chamber towards breakage face. Supporting members come in the form of metal rods which are combined in groups of 3-5 members with joining of their ends brought out into dismantling chamber with the use of flexible tie-rod. Each group of supporting members depending on mining and technical conditions is extracted together with dismantled section of support or right after dismantling of the whole powered support. EFFECT: decreased labor input to dismantling. 4 cl, 5 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR FORMING A DISMANTLING CHAMBER WHEN DEVELOPING SLIM COAL BEDS | 2020 |
|
RU2743162C1 |
PROCESS OF DEVELOPMENT OF GENTLY DIPPING AND INCLINED COAL FORMATIONS WITH USE OF CLEANING POWERED COMPLEXES | 2001 |
|
RU2200840C2 |
SHIELD SUPPORT FOR STEEPLY DIPPING SEAMS | 1993 |
|
RU2078214C1 |
DISMANTLING CHAMBER ERECTION METHOD | 0 |
|
SU1765447A1 |
METHOD OF ERECTION OF DISMANTLING ROOM | 0 |
|
SU1696722A1 |
METHOD AND APPARATUS FOR DISMANTLING A POWER ROOF SUPPORT | 0 |
|
SU903569A1 |
CONTROL METHOD OF POORLY CAVING ROOF AT ENTRY OF MECHANISED COMPLEX TO REMOVAL CHAMBER | 2011 |
|
RU2472936C1 |
SECTION OF POWERED SUPPORT | 1996 |
|
RU2134792C1 |
REMOVAL METHOD OF POWERED MINING FACE COMPLEXES | 2007 |
|
RU2384708C2 |
SHIELD POWERED SUPPORT FOR STEEPLY DIPPING AND SLOPING SEAMS | 1993 |
|
RU2066765C1 |
Authors
Dates
2002-10-10—Published
2000-10-30—Filed