FIELD: mineral concentration; applicable in processing of placer and primary terrigenous and aquagenic deposits. SUBSTANCE: installed in front part of line is device for disintegration of initial material, and deslimer is installed at the outlet of said device. Deslimer is connected by its outlet with device for grading mineral to size. Connected with outlet of fine fraction classifier is drying device, and connected to outlet of medium fraction device are magnetic and gravity-type apparatuses. Located behind drying device is electrostatic apparatus, and behind magnetic and gravity-type apparatuses is finishing unit. EFFECT: higher efficiency processing of ore materials, and separation of floating and fine-particle gold. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
CONTINUOUS PRODUCTION LINE FOR PROCESSING SCHLICH MATERIALS | 1996 |
|
RU2111795C1 |
FLOW LINE FOR PROCESSING OF SIZED MATERIAL | 1995 |
|
RU2098190C1 |
LINE FOR REPROCESSING OF METAL-BEARING RAW MATERIAL OF GOLD-CONTAINING ORES AND SANDS | 2000 |
|
RU2185451C2 |
FLOW LINE FOR PROCESSING OF METALLIFEROUS RAW MATERIALS OF GOLD-BEARING DEPOSITS | 1997 |
|
RU2129618C1 |
METHOD OF EXTRACTING PARTICLES OF NOBLE METALS FROM METALLIFEROUS SANDS AND PRODUCT LINE TO THIS END | 2010 |
|
RU2427431C1 |
METHOD OF CONCENTRATION OF GRAVELS AND PRODUCTION LINE FOR REALIZATION OF THIS METHOD | 2000 |
|
RU2187374C2 |
METHOD OF UPGRADING OF SANDS | 2002 |
|
RU2229937C2 |
METHOD OF THE NOBLE METALS EXTRACTION FROM THE MINERAL RESOURCES ALLUVIAL AND TECHNOGENIC DEPOSITS (OPTIONS) AND PRODUCTION LINE FOR ITS IMPLEMENTATION | 2017 |
|
RU2659910C1 |
METHOD OF CONCENTRATION OF PLACERS | 2001 |
|
RU2212277C2 |
PROCESSING LINE FOR PROCESSING CLAY GOLD-BEARING SANDS OF PLACER DEPOSITS | 2019 |
|
RU2709259C1 |
Authors
Dates
2002-11-10—Published
2001-01-03—Filed