FIELD: coking. SUBSTANCE: method is realized by heating of coke drum external surface section before coke drum filling with initial hot coking material. Said external surface section is located neat point of fastening of drum shell to bearing support in the form of shirt. Such heating of drum external surface allows reduction of heat stresses arising in welds fastening support. to drum. EFFECT: reduced plant cycle duration for slowed-down coking. 7 cl, 6 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF RELIEVING STRESS IN DRUMS FOR SLOW-SPEED COKING PROCESS | 1998 |
|
RU2189383C2 |
METHOD FOR PROCESSING HEAVY HYDROCARBON OIL PRODUCT BY SLOW COKING | 0 |
|
SU1627088A3 |
RETARDED COKING METHOD | 1996 |
|
RU2201954C2 |
ADDITIVES INTRODUCING INTO THE COKE DRUM | 2013 |
|
RU2626955C2 |
METHOD OR PREPARING PRODUCTS FROM MESOPHASE RESIN, PRODUCTS FROM SOLVATED MESOPHASE RESIN, AND SOLVATED MESOPHASE RESIN | 1993 |
|
RU2104293C1 |
INNER CASING OF COKE DRUM UNIT OF DELAYED COKING UNIT | 2015 |
|
RU2690344C2 |
METHOD FOR PRODUCING DISTILLATE FUEL AND ANODE GRADE COKE FROM VACUUM RESID | 2014 |
|
RU2628067C2 |
PROCEDURE FOR PROCESSING OIL RESIDUES BY DELAYED COKING AND COKING REACTOR | 2010 |
|
RU2437916C1 |
AUTOMATED CONTROL OF BATCH PROCESS OF DELAYED COKING UNIT | 2013 |
|
RU2627372C2 |
METHOD TO REDUCE CONSUMPTION OF SILICONE DE-FOAMING AGENTS IN DELAYED COKING PROCESSES | 2013 |
|
RU2629945C2 |
Authors
Dates
2002-11-10—Published
1998-06-11—Filed