FIELD: oil-gas producing industry and geological prospecting. SUBSTANCE: stand well for simulation of uncontrolled flowings and methods of their control consists of well and base. Well is provided with pipelines for supply of gas and water and also wellhead for installation of changeable wellhead members. Base is made in the form of metal platform with wellhead grip. Platform is installed in wellhead pit on four lifts-manipulators capable of simultaneous or alternating reciprocation. Wellhead pit has water supply and discharge lines. Well is equipped with stationary or mobile lifting structure. EFFECT: simulation of uncontrolled flowings at wellhead and operations for their elimination with use of standard and nonstandard equipment and devices. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR BLOWOUT LIQUIDATION IN OIL AND GAS WELLS | 2004 |
|
RU2261982C1 |
PACKER | 1999 |
|
RU2178511C2 |
PREPARATION OF WELL HEAD ZONE FOR ELIMINATION OF EMERGENCY FLOWING | 2011 |
|
RU2485287C1 |
METHOD FOR LIQUIDATION OF OPEN FOUNTAINS AT OIL AND GAS WELLS | 2002 |
|
RU2231627C1 |
MOBILE ROBOTIC SYSTEM OF FLOWING WELLS MRK-FS | 2019 |
|
RU2718550C1 |
PROCESS OF RESTORATION OF WELLS UNFIT FOR FURTHER USE | 1999 |
|
RU2176724C2 |
METHOD FOR ELIMINATION OF FLOWING WELLS AT OFFSHORE WELLS WITH UNDERWATER LOCATION OF WELLHEADS THEREOF | 2019 |
|
RU2726742C1 |
OFFSHORE WELL FOR OIL AND GAS RECOVERY WITH ABOVE-WATER PLACEMENT OF WELLHEAD EQUIPMENT | 2014 |
|
RU2566162C1 |
SMART GAS AND GAS CONDENSATE WELL AND METHOD OF ITS RIGGING-UP | 2014 |
|
RU2568448C1 |
PROCEDURE FOR REMOVING PARAFFIN-HYDRATE BLOCKS IN OIL WELLS AND FACILITY FOR IMPLEMENTATION OF THIS PROCEDURE | 2009 |
|
RU2398956C1 |
Authors
Dates
2002-12-10—Published
2000-10-20—Filed