FIELD: mining industry, particularly, mining of remote kimberlite pipes in permafrost rocks under North extreme conditions. SUBSTANCE: development of remote kimberlite pipe is carried out by rotational method with construction of opencast vertical and inclined flanks and use of permafrost-protective coatings of slopes with glass cloth and reinforcing metal net with the help of rods. Safety berm with protective wall is left on opencast flank. Transportation operations inside opencast are carried out by battery-driven dump trucks, and on the surface, by dump trucks operated on gas fuel. Mined bulk is lifted by steeply inclined conveying hoists arranged in inclined shaft connected with opencast horizon by means of cross-entries. Ore is mined by continuous miners. Electrical power stations on opencast flank are formed of gas-diesel units supplied from gas-condensate deposits. EFFECT: reduced volume of removed overburden rocks from opencast, improved ecological conditions in region. 1 dwg, 3 tbl, 1 ex
Title | Year | Author | Number |
---|---|---|---|
PROCESS OF DEVELOPMENT OF DEEP STRIPPING | 2000 |
|
RU2199664C2 |
METHOD FOR OPENING AND PROCESSING DEEP HORIZONS OF KIMBERLITE PIPES | 2003 |
|
RU2233982C1 |
METHOD FOR DEVELOPING DEEP OPEN PITS IN CRYOLITIC ZONE | 2018 |
|
RU2676352C1 |
METHOD OF REFINEMENT OF DEEP KIMBERLITE QUARRIES | 2017 |
|
RU2661769C1 |
DEVELOPMENT METHOD OF KIMBERLITE TUBES | 2008 |
|
RU2426882C2 |
METHOD FOR OPENCAST STEEP DEPOSIT MINING | 2005 |
|
RU2294434C1 |
METHOD FOR DEVELOPMENT OF DEEP HORIZONS OF DIAMOND-MINING PITS IN CRYOLITHOZONE CONDITIONS | 2019 |
|
RU2698750C1 |
RECONSTRUCTION METHOD FOR PIT HAVING TWO ORE BODIES ARRANGED ONE NEAR ANOTHER | 2006 |
|
RU2314420C1 |
METHOD OF BUILDING UP AN INOPERATIVE SIDE OF DEEP OPEN PIT | 2019 |
|
RU2713844C1 |
OPENCAST WITH TWO CLOSELY LOCATED ORE BODIES DEVELOPMENT METHOD | 2008 |
|
RU2382200C1 |
Authors
Dates
2003-01-20—Published
2000-01-10—Filed