FIELD: metallurgy, possibly foundry, namely taking charge and loading it into cupola. SUBSTANCE: installation includes bins mounted on foundation and designed for discharging metallic component, charge and loose materials respectively and periodically connected with reception vessel arranged on movable weighing car that moves along guides; lifter of reception vessel; feeders. Feeder for supplying metallic component of charge is in the form of rotating cone tube that is narrowed and inclined in direction of discharging. EFFECT: improved design of constructional members of installation. 2 dwg
Title | Year | Author | Number |
---|---|---|---|
LOADING DEVICE OF HEAT-TREATING RESERVOIR | 1997 |
|
RU2110029C1 |
BLAST SMELTING CONTROL SYSTEM | 2001 |
|
RU2199590C1 |
METHOD FOR CONTROLLING BLAST FURNACE OPERATION | 1999 |
|
RU2167202C1 |
BLAST FURNACE HOPPER PLATFORM | 1999 |
|
RU2158767C1 |
BLAST-FURNACE METHOD | 2000 |
|
RU2184152C1 |
BULK MATERIALS FEEDING APPARATUS FOR TREATING LIQUID METAL IN THE PROCESS OF CONTINUOUS CASTING | 1999 |
|
RU2172657C1 |
LOADING RAMP OF BLAST FURNACE HOPPER | 1996 |
|
RU2092566C1 |
METHOD OF BLAST-FURNACE SMELTING | 1997 |
|
RU2117049C1 |
METHOD OF A BLAST-FURNACE SMELT | 2004 |
|
RU2254374C1 |
INSTALLATION FOR CHARGING SKIP OF BLAST FURNACE | 1995 |
|
RU2084538C1 |
Authors
Dates
2003-01-20—Published
2000-04-14—Filed