FIELD: pipeline laying. SUBSTANCE: invention relates to underground laying of pipelines in mountains. Troughs are installed in broken line or arc in sections of tectonic fault zone in trenches. Pipeline in troughs is suspended from cross-bars in spring-loaded hangers to provided displacement of pipeline in vertical and horizontal planes. EFFECT: improved reliability of pipeline. 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF LAYING PIPELINES OVER TECTONIC FAULT | 2004 |
|
RU2264577C1 |
METHOD OF LAYING UNDERGROUND PIPELINE | 2003 |
|
RU2256839C2 |
METHOD OF BUILDING UNDERGROUND PIPELINE ON TECTONIC FRACTURE SECTIONS | 2003 |
|
RU2262631C2 |
FOUNDATION | 0 |
|
SU1805171A1 |
LANDSLIDE CONTROL STRUCTURE | 2004 |
|
RU2269626C1 |
CONSTRUCTION METHOD OF UNDERGROUND PIPELINE AT INTERSECTION OF TECTONIC BREAKS | 2008 |
|
RU2365802C1 |
LANDSLIDE CONTROL STRUCTURE | 2002 |
|
RU2276232C2 |
METHOD FOR ERECTION OF UNDERGROUND PIPELINE AT CROSSING OF TECTONIC FRACTURES | 2008 |
|
RU2363874C1 |
METHOD FOR ERECTION OF UNDERGROUND PIPELINE AT CROSSING OF TECTONIC FRACTURES | 2008 |
|
RU2363876C1 |
STRUCTURE FOR PROTECTING UNDERGROUND PIPELINES AGAINST LANDSLIDE | 2003 |
|
RU2234572C1 |
Authors
Dates
2003-01-27—Published
2000-03-16—Filed