FIELD: civil engineering.
SUBSTANCE: invention relates to construction and can be used at subsurface pipelining, intersecting areas of tectonic fractures. In construction methods of underground pipeline at intersection of tectonic fractures in the capacity of trays there are used cylindrical closed shells, filled by compresses air. Shell is fixed helical on outer face of pipeline lengthwise its welded section. Shells are connected to each other by nipple with ability of pumping and air pressure checkup in it through the air duct. Shell diametre is accepted equal to 0.15D, where - D - outside diametre of pipeline, m. Distance between turns is accepted equal to 0.2D, m. Inclination angle of turns to horizontal line is accepted equal to not less than 45°. Shells are installed on pipeline in area of tectonic fracture with overlapping of this area more than 4 times lengthwise pipeline.
EFFECT: application of particular construction method of underground pipeline at intersection of tectonic fractures provides effectiveness increase; reduction of mounting laboriousness; reduction of maintenance laboriousness.
2 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR ERECTION OF UNDERGROUND PIPELINE AT CROSSING OF TECTONIC FRACTURES | 2008 |
|
RU2363874C1 |
SECTION OF UNDER WATER PIPELINE AND PROCEDURE FOR ITS FABRICATION | 2009 |
|
RU2429404C1 |
METHOD FOR ERECTION OF UNDERGROUND PIPELINE AT CROSSING OF TECTONIC FRACTURES | 2008 |
|
RU2363876C1 |
METHOD FOR ERECTION OF UNDERGROUND PIPELINE AT CROSSING OF TECTONIC FRACTURES | 2008 |
|
RU2363875C1 |
METHOD OF CONSTRUCTING BURIED PIPELINE IN CROSSING SECTION WITH FORECAST CONCENTRATED DEFORMATIONS OF ENCLOSING STRATA | 2011 |
|
RU2460926C1 |
METHOD TO INSTALL UNDERGROUND PIPELINE WHEN CROSSING ACTIVE SEISMOTECTONIC AREA | 2012 |
|
RU2509249C2 |
METHOD OF LAYING UNDERGROUND PIPELINE | 2003 |
|
RU2256839C2 |
METHOD OF CONSTRUCTION OF UNDERGROUND PIPELINE IN SECTION OF TECTONIC FAULTS | 2000 |
|
RU2197667C2 |
METHOD OF BUILDING UNDERGROUND PIPELINE ON TECTONIC FRACTURE SECTIONS | 2003 |
|
RU2262631C2 |
UNDERGROUND PIPELINE FOR SEISMIC ZONES | 2001 |
|
RU2241889C2 |
Authors
Dates
2009-08-27—Published
2008-05-28—Filed