FIELD: construction.
SUBSTANCE: method comprises trenching, laying a section of pipe of diameter greater than that of the pipeline, passing the pipeline through the section of the pipe, sealing the clearance between the pipe section and pipeline, filling the pipe section through branch pipes with fluid of density higher than that of the agent to be pumped through the pipeline until the pipeline floats up, and filling the trench. The pipeline sections are interconnected with the compensators.
EFFECT: enhanced reliability of the pipeline.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
CONSTRUCTION METHOD OF UNDERGROUND PIPELINE AT INTERSECTION OF TECTONIC BREAKS | 2008 |
|
RU2365802C1 |
METHOD FOR ERECTION OF UNDERGROUND PIPELINE AT CROSSING OF TECTONIC FRACTURES | 2008 |
|
RU2363874C1 |
METHOD FOR ERECTION OF UNDERGROUND PIPELINE AT CROSSING OF TECTONIC FRACTURES | 2008 |
|
RU2363875C1 |
METHOD FOR ERECTION OF UNDERGROUND PIPELINE AT CROSSING OF TECTONIC FRACTURES | 2008 |
|
RU2363876C1 |
SECTION OF UNDER WATER PIPELINE AND PROCEDURE FOR ITS FABRICATION | 2009 |
|
RU2429404C1 |
METHOD OF CONSTRUCTING BURIED PIPELINE IN CROSSING SECTION WITH FORECAST CONCENTRATED DEFORMATIONS OF ENCLOSING STRATA | 2011 |
|
RU2460926C1 |
METHOD OF LAYING PIPELINES OVER TECTONIC FAULT | 2004 |
|
RU2264577C1 |
UNDERGROUND PIPELINE FOR SEISMIC ZONES | 2001 |
|
RU2241889C2 |
METHOD OF CONSTRUCTION OF UNDERGROUND PIPELINE IN SECTION OF TECTONIC FAULTS | 2000 |
|
RU2197667C2 |
METHOD OF BUILDING UNDERGROUND PIPELINE ON TECTONIC FRACTURE SECTIONS | 2003 |
|
RU2262631C2 |
Authors
Dates
2005-07-20—Published
2003-09-03—Filed