FIELD: construction.
SUBSTANCE: method comprises trenching, setting chutes in the trench, and laying the pipeline in the chutes. The chutes are made of halves of utilized automotive tires. The pipeline is laid into the half of the tire and then is covered with the second half of the tire. The tires are interconnected to combine them into the groups, and the trench is filled with soil.
EFFECT: enhanced reliability.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
CONSTRUCTION METHOD OF UNDERGROUND PIPELINE AT INTERSECTION OF TECTONIC BREAKS | 2008 |
|
RU2365802C1 |
METHOD OF CONSTRUCTING BURIED PIPELINE IN CROSSING SECTION WITH FORECAST CONCENTRATED DEFORMATIONS OF ENCLOSING STRATA | 2011 |
|
RU2460926C1 |
METHOD FOR ERECTION OF UNDERGROUND PIPELINE AT CROSSING OF TECTONIC FRACTURES | 2008 |
|
RU2363874C1 |
METHOD OF BUILDING UNDERGROUND PIPELINE ON TECTONIC FRACTURE SECTIONS | 2003 |
|
RU2262631C2 |
METHOD OF CONSTRUCTION OF UNDERGROUND PIPELINE IN SECTION OF TECTONIC FAULTS | 2000 |
|
RU2197667C2 |
SECTION OF UNDER WATER PIPELINE AND PROCEDURE FOR ITS FABRICATION | 2009 |
|
RU2429404C1 |
METHOD OF LAYING UNDERGROUND PIPELINE | 2003 |
|
RU2256839C2 |
METHOD FOR ERECTION OF UNDERGROUND PIPELINE AT CROSSING OF TECTONIC FRACTURES | 2008 |
|
RU2363875C1 |
METHOD FOR ERECTION OF UNDERGROUND PIPELINE AT CROSSING OF TECTONIC FRACTURES | 2008 |
|
RU2363876C1 |
UNDERGROUND PIPELINE FOR SEISMIC ZONES | 2001 |
|
RU2241889C2 |
Authors
Dates
2005-11-20—Published
2004-03-24—Filed